I wonder how long it’s going to take to break even. It’s pretty expensive to install piping. Even if you use no-dig tech.
Also, if they go out of business the infrastructure built isn’t going to be taken away.
The problem being that a huge part of rising construction cost in infrastructure is poor documentation of current infrastructure. You have a lot of stops in production when you encounter unknown piping.