Nuclear would be the worst technology for filling temporary gaps in the production of renewables. The ramping speed of nuclear reactors is limited, and they cannot be throttled below 40% output without shutting them down entirely for quite some time. On top of that, the main expense of nuclear reactors is building and maintaining them, so throttling a reactor is not reducing the costs. You really want to run a nuclear reactor with a high load.