(It's worth remembering that the "modern", i.e. 1930s, three-phase power grid is built primarily to power motors on factory floors. I don't know if these are the highest load these days, but wouldn't be surprised if not.)
(It's worth remembering that the "modern", i.e. 1930s, three-phase power grid is built primarily to power motors on factory floors. I don't know if these are the highest load these days, but wouldn't be surprised if not.)
Small nitpick, I don't believe 3 phase power was picked primarily because it was convenient for powering 3 phase motors - it was picked because it's convenient for generating and transmission. There is no need for a neutral conductor in a balanced AC transmission system for example and it can very efficiently be converted to high voltage and stepped down again. It also results in modest power pulses though the generator compared to single phase etc.
VFDs have made A/C motors far more efficient than one driven by an across-the-line starter.
Should switch to 400Hz like aircraft do. Not just comically huge transformers, but also motor/generator magnets.
> A special generator was designed to create an output of 400 Hz. This allowed a motor which was the size of a watermelon to be replaced by one the size of a one-pound coffee can which could do the same work.
> The saving of weight allowed increased cargo capacity and decreased fuel consumption. Power at 400 Hz for aviation was a success and became the standard of modern AC-powered aircraft.
> Airports all around the world standardized on the same power system. This included the physical plug and cable as well as the 400 Hz power so that aircraft from anywhere in the world could land and be serviced wherever they landed. The aviation power system of 400 Hz became one of the first worldwide-adopted standards.
https://fcxinc.com/why-the-aviation-industry-operates-on-400...
Higher frequency lets you get away with smaller transformers, but decreases the skin depth on transmission lines which increases losses.
When I was working at SAS in ATX circa 2013, the 2 manufacturing lines were responsible for something like 10% of the city's average power consumption. I can't imagine the bleeding edge will have improved much - EUV light sources aren't exactly Energy Star compliant.