But don't worry, ITER, CFS and Helion will never achieve economical fusion reactors either. The reason is quite simple: in order to heat a certain volume with matter to a certain temperature, you need to heat both the matter (vibration energy) and the vacuum (radiation energy). The energy to heat matter is proportional to the temperature (it's actually the definition of temperature). The energy to heat the vacuum is proportional to the fourth power of the temperature. If you draw a graph of T and T^4 you'll see that initially T^4 is negligible compared to T, and later T is negligible compared to T^4. If you want to heat 1m3 of vacuum to the temperature needed for sustained fusion, it takes more than 10 kT of TNT equivalent. In an actual nuclear bomb, this is available from the primary fission bomb; plus the volume of the part undergoing fusion is squeezed tremendously, so it's nothing close to 1 m3. ITER plans to have a volume of plasma of 840 m3. At the temperatures they talk about, the energy to heat 840 m3 exceeds the energy released by the Tsar bomba.
Bottom line: the only possible way to get controlled fusion is the NIF way. But even that one is very, very far in the future.