I have evidence and numbers.
Update: I got downvoted for not posting them. I did in the link above though.
https://www.coinmint.one/ is the data center. They have about 500MW of power going to them from the Moses-Saunders dam.
They don't need to shut down cause it is hydro and 24/7. They actually help keep the dam running cause they balance the load coming from it. Just like the aluminum smelter before it did. The location of the facility and dam are near the border of Canada and the US. It is very remote and in the middle of nowhere with enough population to consume the 500MW. There are main grid lines going past them, but it would likely need new infrastructure to connect to it at that much power.
I've seen their power costs (including transmission), I can't post that, obviously. But, a large chunk of their costs, is transmission, which pays for the install and maintenance of the lines running the few miles from the dam. These are large / tall physical towers.
Disclosure: I'm a former very large scale bitcoin/litecoin/ethereum miner and now building an AI bare metal gpu service.