It means what it says - imported from a tie to another adjacent network. It can be renewable, but does not have to be.
And coal from Utah. That's still huge at night.
Reading more, there are two high voltage DC lines into SoCal: one from a coal plant in Delta Utah (2.4 Gw, not just from that plant, but let’s say majority coal), the other from a hydro conversion station on the Columbia in Oregon/washington (3.1 Gw). Looking at the map above it looked like the latter one terminated in Las Vegas but I guess it actually goes into SoCal.