NYT doesn’t.
NYT doesn’t.
Costs already spent:
- Design
- Part manufacturing
- Final assembly
Costs remaining: - Testing
- Operations
Future costs which will be spent anyway: - Launch
Which begs the question... why not skip testing?Worst case, it's non-functional or fails to land, in which case you don't have to spend the operational costs.
If it fails it dooms your career, or at least that's how it would be perceived.
Isn't it (future_costs + expenditures_so_far > value) rather than (future_costs > value)? If I expect to win 10 euros from the lottery and put in 9 euros already, then buying another 2-euro lottery ticket is a loss because spending 11 for an expected gain of 10 is a loss even if those extra 2 euros to gain a potential 10... or am I falling for the fallacy now?
Is this like the monty hall thing where the answer changes if you're given a chance to change your mind halfway through (in that you'd not spend 11 up front, but now that you spent 9, maybe spending the remaining 2 to minimize the loss is a good idea)?
where it gets difficult is if you previously spent $10,000 and you need to spend $10 more to get $11. at that point it can feel like a good bargain compared to the total losses. that's the sunk cost fallacy.
The article did mention that instruments on the lander would be removed and repurposed for other missions, so I guess they wanted to save money there instead of sending the lander as-is with a high probability of it not functioning at all, and all the hardware being a total waste.
I argue it doesn't in the way you want them to.
They're cancelling it because it couldn't be saved. Projects _always_ that get approved are underestimated in cost with ballooning budgets the expectation. The point is, everyone is hoping the project is important enough AND expensive enough that congress will keep funding it because sunk-cost is almost ignored.
JWST is the poster child of this concept. SLS likely to be next.
I hate that SLS is moving forward in this manner, but I do believe 2 launch providers is better than 1...?
They don't need to communicate this to achieve their objective. Their headline is designed to bait, capture, and sell its product.