I'd love someone to actually do a credible cost analysis of an evacuated tunnel train. Unfortunately I don't think Oster did.
[1] http://secondavenuesagas.com/2010/01/14/the-costs-of-second-...
I'd love someone to actually do a credible cost analysis of an evacuated tunnel train. Unfortunately I don't think Oster did.
[1] http://secondavenuesagas.com/2010/01/14/the-costs-of-second-...
1988 $3.6 billion = ~$7 billion today[3].
1994 $21 billion = ~ $32 billion today[4].
Put it altogether, the tunnel itself would be around $3.5 trillion[5]. Maglev + vacuum stuff would cost more.
(BTW, I love WolframAlpha for stuff like this.)
[1] http://en.wikipedia.org/wiki/Seikan_Tunnel
[2] http://www.engineering.com/Library/ArticlesPage/tabid/85/Art...
[3] http://www.wolframalpha.com/input/?i=%24US3.6+billion+1988+d...
[4] http://www.wolframalpha.com/input/?i=%24US21+billion+1994+do...
[5] http://www.wolframalpha.com/input/?i=%28%28%2432+billion%29%...
A better comparison is an actual underwater tube: http://en.wikipedia.org/wiki/Transbay_Tube
3.6 miles cost about $1 billion in 2012 dollars. Closer to $55k/foot.
Don't get me wrong. This is still impossibly expensive even at that lower rate: $22 trillion.
Even at using costs of the propsed high speed rail in California ($80M/mile), nyc-london would cost $280 billion.
Which is roughly 1 / 14th the cost of the Iraq war. Not bad if you think about it.
2006 revenues: $2440 billion
2012 revenues: $2660 billion
2006 spending: $2660 billion
2012 spending: $3790 billion
2013 spending: $3803 billion (Obama's proposed budget)
[Source: Wikipedia.]
Just think - we could do three or four megaprojects a year with a 2006-esque budget elsewhere plus those kinds of budget deficits.
Of course, as anyone in California is painfully aware, the high-speed rail project is a complete joke :) you'd need to trust that this one would do better.
Also, as an economics aside: In the private sector, a $280 billion project should hope to earn in the neighborhood of $11 billion a year in profit/savings in order to cover the cost of capital. This is, of course, after equipment maintenance, fuel/power, deprecation, labor, etc.
The nice thing about a transatlantic tunnel is that crustecaeans can be bought off cheaply
The various environmental organizations aren't going to be bought off cheaply.
Plus any operation at this scale will require all the security if not more of a normal one. It is just too big not to be a target for someone.
If you get the sierra club complaining publicly about the tunnel, you instantly have about half of the politicians in the country in favor of it.
I can't imagine it'd be more expensive than tunneling 3000 miles under an ocean.
How does the energy/pound and energy/CC compare to decent rocket fuel?
(San Francisco's rail connection across the bay uses this technique)
Which is enough to drop drag a lot, and still maintain lift in, say, commercially viable air transportation vehicles.
Lowest costs I've seen to LEO are about $1,000/lb. Suborbital flight isn't much lower than that, and we're still looking at something on the order of $10k - $1m per passenger at rates like that. Affordable to some, but (considering you've likely got a baggage, life support, and related allowance) pretty pricey all the same.
$10k is comparable to Concorde, as I recall. I consider that a very optimistic estimate.
In other words you're talking about sinking 3 meters of tube that would weigh 76 fewer pounds than if there were air. This is probably a small effect compared to the weight of the strong metal casing that would need to surround such a vacuum.
So since we can sink normal air-filled subways quite normally (e.g. the BART in San Francisco) this must be a well-established technology.
It will _want_ to collapse. It's not sitting there doing nothing.
Who knows what this claim is based on, but it is there.
The firm fixed bid for the 96-mile (154 km) Evacuated Tube Transport (ETT) system was $253M, this was less than one tenth of the cost of the bid by Global Rail Consortium to build electrified double track High Speed Rail for $2.6B. The bid by et3 contained letters of support by three entities in China to supply IP and key materials for the project. The engineering consultants hired by the authority did not dispute the validity of the et3 bid price or ETT technology, but recommended to eliminate the et3 bid from consideration for other reasons.[1]
This comment doesn't pass judgment on whether Daryl Oster is a patent troll or not, but that's also a discussion worth having.
Edit: add this update --
Interestingly this link: http://www.freerepublic.com/focus/f-news/843626/posts claims that the ET3 bid was 1.2B$ which is $12.5M/mile which is a lot more credible (still low though since the surrounding infrastructure to keep the tube evacuated, the mag lev stuff, etc all add cost over regular fused rail electrified service (which California is considering for its fast rail) and that is looking closer to $25M/mile in the current state of the art)
Don't forget every 10m adds 1atm water pressure. Building a glass enclosed under sea walkway 30m down is not that much harder than building one 20m down and these projects are going to be using glass.
Firstly: As I see it, an evacuated tunnel at 20m is a very different proposition to a non-evacuated tunnel at 30m, even if the pressure difference is the same. Why? Well, your big problem is always going to be leaks. In an air-filled tunnel you can get away with microscopic cracks, no problem; you've got a small direct interface between water and air, and the surface tension of the water is enough to keep the water in place. It's very hard to force water through a really tiny crack. In a vacuum, however, surface tension goes away -- liquid water at an interface with vacuum will boil, and all of a sudden you've got water vapour filling your nice evacuated tube through every microscopic crack in its five thousand mile length. Nasty. Clearly the joined-concrete construction used for the Transbay Tube isn't going to be sufficient.
Secondly: unfortunately the Atlantic Ocean isn't 20m deep, or 30m deep, or even 40m deep like the deepest point of the Transbay Tube. It's several kilometers deep.
The ocean depth point is interesting. The article says "engineers would tether the tunnel at a fixed depth." I take this to mean tethering to the bottom and relying on buoyancy to keep the tunnel floating at the right depth, which presumably could be 30m or so.
Yep, because now you've just got your air rushing into the vacuum through the cracks, instead of water.
The ocean depth point is interesting. The article says "engineers would tether the tunnel at a fixed depth." I take this to mean tethering to the bottom and relying on buoyancy to keep the tunnel floating at the right depth, which presumably could be 30m or so.
Even if you could get it to be neutrally bouyant at 30m (realistic estimate? dunno) you're now stuck with a tube, five thousand miles long, floating free in the ocean and anchored only to the bottom. Even neutrally bouyant, there'd have to be huge strains on the joints due to ocean currents, plus presumably some up-and-down forces as the season changes the water temperature and... heck, even a whale headbutting such a flimsy structure sounds like a disaster waiting to happen. And remember, you can't afford to get any imperfections in your tube or it'll leak -- that probably eliminates anything you might have used to build in a bit of flexibility.
Fair enough. I imagine there's a trade-off between the quality of the tunnel materials and the number of pumps needed along the way, assuming an imperfect vacuum is good enough.
I'd be worried about flexibility too. Skyscrapers do pretty well in high winds and earthquakes, so I'm not completely convinced that a similar effect isn't possible with an underwater tube. Any bending would have to be extremely gradual, though, if there's any hope of shooting something through it at high speeds. I agree that glass isn't going to cut it.
It's 50% harder.
What pressure are the passengers exposed to?
I ask because 1 hour @ 4 atmospheres of 80% N2/20% O2 is risking decompression illness. (Yes, 4 - you've got 1 atmosphere at sea level.) You can reduce that risk by increasing the O2 percentage but if you do that too much, you're risking O2 toxicity.
http://en.wikipedia.org/wiki/Burma_Railway
Five hundred men died for every mile of track laid, but hey, they had too many prisoners anyway!
[1] http://tacnet.missouri.org/history/railroads/rrcosts.html
Part of it is that some folks really hate rail, so much so that they will continually sue anyone who is working to build it. They will argue wildlife endangerment, habitat destruction, cancer risk, suicide risk, traffic risk, earthquake/disaster risk, global epidemic risk, job preservation/creation/destruction risk, you name it. Anything to get back in court and have a judge temporarily suspend work. Because you hire someone to work on a project, and they can't because of some court order, you still have to pay them. So what happens is these projects have 'burn rates' (which is the cost of renting equipment (or depreciating it if you own it) and labor and materials (some of which degrade over time if not used)) and then you have 'able to work' days. Actual work days might be 90 for a mile of track, but time actually passed is like a year. So the other 275 days people sat on their hands while expensive lawyers argued to get work restarted.
Its one of the things I bring up at town hall meetings with politicians. The tax payer, and the 'NIMBY' [1] folks, fight a very asymmetric kind of warfare. No court challenges until funds are committed, and then six. You need look no further than the maneuvering around the California High Speed Rail project to see it play out in all of its ugliness.
[1] NIMBY -acronym Not In My Back Yard for people who are opposed to any new infrastructure near where they live.
It's the opposite in the USA.
The Economist had an interesting report on the reasons for the difference: http://www.economist.com/node/16636101
The U.S. instead tends to work on a model where the legislature passes general rules, and then agencies administer the rules in specific cases. So, for example, a specific rail plan is proposed pursuant to a piece of legislation, but the plan is not itself a piece of legislation superseding others. That leaves it open to all sorts of lawsuits alleging that it didn't comply with the legislation that applies to it.
>San Jose was celebrating their first 4 miles of light rail (in just 10 years from the start of the project!)
> Actual work days might be 90 for a mile of track, but time actually passed is like a year
So currently, San Jose can build 0.25 mi/year. Optimistically, with no lawsuits, their actual work days could increase to say, 225 days/year, which is 2.5x faster. So we're up to say, 0.66 mi/year, which still sounds way too low. What are the other bottlenecks?
I've gotten some positive feedback for that but have yet to find someone willing to actually submit it in a bill.
I'm not saying an undersea rail system is practical or smart. I'm just asking the relevance of your comparisons to US urban construction costs to begin with.
As a suggestion, a different tone might make your post seem more useful and less trollish. For example "An undersea tunnel will require serious construction breakthroughs to be practical. As a comparison, today's costs...". That would be a lot more constructive than attacking the people behind the article.
My initial point is a prima facie argument, the proposal is impractical by inspection. I certainly stand by that assertion, but as part of the supporting argument we've been discussing land based construction with the implicit, albeit not as well supported, stipulation that sea based construction would always be more expensive than land based.
An interesting way to approach the problem would be to outline the design space in terms of operation cost, development cost, and rate of return and see what sort of solutions, if any, might fit inside that box.
How can we get back to a society that is able to engage in large scale projects again? Look at the rapid low-cost subway construction in China today.
I think you're a super smart guy with really broad interests, experience, and knowledge. I think you could make the impossible happen if you applied yourself to it.
Modern trains also are heavier and accelerate and decelerate faster than the trains you see in westerns. Both mean that they exert greater forces on the rails.
Finally, safety standards are way higher. That means that material must be of higher quality and tested better, both at the factory and after installation.