Director: "We need a factory that's tooled around manufacturing boxes of cookies with blue frosting. We don't need any other colors, just blue frosting!"
Junior Engineer: "He's going to come back in two days and ask for red frosting. Better make sure it can do any color."
Mid Level Engineer: "He's going to come back in a week and ask us for multi-color boxes. Better make sure it can do any combination of colors in each box."
Senior Engineer: "He's going to have the big idea to add sprinkles, writing, and branch out into eclairs. Better make sure the factory is extensible and can retool itself per-batch to make each box to-order."
The worst part about this is you can see where uncertainty leads to over-engineering and consequences if your psychic senses are off. This is where a good PM steps in and forces folks like this into a roadmap on a long-enough time-scale that you can see the mid-level's design is all we'll need. And if you still want eclairs we can talk about that in 2026.
Pain like this is critical feedback for a organization. Blunting it hurts more in the long term.