Google commits to buying power generated by nuclear-energy startup Kairos Power
wsj.com
wsj.com
Kairos is in a pretty early stage. They started building a test reactor this summer, scheduled for completion by 2027:
https://www.energy.gov/ne/articles/kairos-power-starts-const...
EDIT: Statement from the official Google announcement linked by xnx below [2]:
Today, we’re building on these efforts by signing the world’s first corporate agreement to purchase nuclear energy from multiple small modular reactors (SMRs) to be developed by Kairos Power. The initial phase of work is intended to bring Kairos Power’s first SMR online quickly and safely by 2030, followed by additional reactor deployments through 2035. Overall, this deal will enable up to 500 MW of new 24/7 carbon-free power to U.S. electricity grids and help more communities benefit from clean and affordable nuclear power.
> "Several high-temperature thermal neutron–spectrum pebble bed reactors are being commercialized. China has started up two helium-cooled pebble bed high-temperature reactors. In the United States, the X-Energy helium-cooled and the Kairos Power salt-cooled pebble bed high-temperature reactors will produce spent nuclear fuel (SNF) with burnups exceeding 150 000 MWd per tonne. The reactor fuel in each case consists of small spherical graphite pebbles (4 to 6 cm in diameter) containing thousands of small TRISO (microspheric tri-structural isotropic) fuel particles embedded in the fuel of zone these pebbles."
(2024) "Safeguards and Security for High-Burnup TRISO Pebble Bed Spent Fuel and Reactors"
https://www.tandfonline.com/doi/full/10.1080/00295450.2023.2...
and
https://www.powermag.com/nuclear-milestone-chinas-htr-pm-dem...
Or alternatively, radioactive dust could be released into the atmosphere such as THTR-300 did.
INL did a gap analysis in 2011 between what was known and what needed research. The german AVR reactor had technical issues that weren't expected -- dust being one of them.
https://inldigitallibrary.inl.gov/sites/sti/sti/5026004.pdf
From what I can tell the dust issue is still a point of contention.
Otherwise similar to the NuScale deal which fell through last autumn.
A PPA like agreement which then only kept rising until all potential utilities had quit the deal.
All honor to Kairos if they can deliver, but history is against them. Let’s hope they succeed.
> NuScale has a more credible contract with the Carbon Free Power Project (“CFPP”) for the Utah Associated Municipal Power Systems (“UAMPS”). CFPP participants have been supportive of the project despite contracted energy prices that never seem to stop rising, from $55/MWh in 2016, to $89/MWh at the start of this year. What many have missed is that NuScale has been given till around January 2024 to raise project commitments to 80% or 370 MWe, from the existing 26% or 120 MWe, or risk termination. Crucially, when the participants agreed to this timeline, they were assured refunds for project costs if it were terminated, which creates an incentive for them to drop out. We are three months to the deadline and subscriptions have not moved an inch.
https://iceberg-research.com/2023/10/19/nuscale-power-smr-a-...
History is not really against them. Our current reactors (mainly pressurized water reactors) are the way they are because Admiral Rickover determined that PWRs are the best option for submarines. He was not wrong, but civilian power reactors are not the same as the reactors powering submarines.
PWRs are expensive mainly because of the huge pressure inside the reactor core, about 150 times higher than the atmospheric pressure. For comparison, a pressure cooker has an internal pressure about 5 times higher than the atmospheric pressure, and such a cooker can explode with a pretty loud bang.
The Kairos Hermes reactor design is based on a design that was tested in the '60s, the Molten-Salt Reactor Experiment [1]. While such a reactor can be used to burn thorium, Kairos decided to go with the far more conventional approach of burning U-235. The reactor operates at approximately regular atmospheric pressure. This should reduce considerably the construction costs.
Of course, there are unknowns. While the world has built thousands of pressurized water reactors, it has built maybe 10 molten salt reactors. For example one quite unexpected effect in the MSRE was the enbrittlement of the reactor vessel caused by tellurium, which shows up as a fission product when U-235 burns.
The Nuclear Regulatory Commission is a very conservative organization, and they don't have much experience with molten salt reactors because nobody has. It took them 6 years to give NuScale an approval for a pressurized water reactor, design that they knew in and out. My guess is that they will not give Kairos an approval without at least 15 years of testing. But Google's agreement with Kairos is quite crucial to keep this testing going.
[1] https://en.wikipedia.org/wiki/Molten-Salt_Reactor_Experiment
MSRs are a costly distraction. They are not viable without literally hundreds of billions in research and development money. That's why all the MSRs startups are failing long before they even start the licensing process.
> For example one quite unexpected effect in the MSRE was the enbrittlement of the reactor vessel caused by tellurium, which shows up as a fission product when U-235 burns.
It was not unexpected. The _main_ issue with MSRs is that they have to contain fluoride salts that release elemental fluorine radicals as a result of radiolysis. So the reactor vessel walls will be eaten up by them, rather rapidly. Especially when reactors are scaled up to a level that makes them practical. And then you have all the fission byproducts that literally include almost all the Periodic Table.
The US produces 40000 billion kWh every decade, so that doesn't really seem that bad to me.
I'm glad they are, actually! Personally, I'm not really convinced by the "small modular reactor" concept. Ok, so building a big nuclear power plant is expensive. But is it really cheaper to build 10 smaller nuclear power plants (which all need to conform to the same safety regulations, need maintenance, personnel etc.) instead?
Actually proving this with a deployed design seems to be the challenge, though with strong headwinds against nuclear across the board, favoring proven designs over newer ones is at least a little faster. That's not a flaw of the design, but intrinsic to the social and political environment.
I also wonder how much of the cost is tied up in the upfront construction and engineering compared to operations.
This IAEA report [1] has more details about this design, and the dozens if not hundreds of other types of molten salt reactor designs. The relevant section for the Kairos Hermes design is 4.5 (pages 41-44).
[1] https://www-pub.iaea.org/MTCD/Publications/PDF/STI-DOC-010-4...
This isn't really accurate. The majority of pressure cookers you can buy operates at an absolute pressure of only about twice the atmospheric pressure.
Hopefully it is just a stepping stone.
To the degree that the prominent "renewables vs. nuclear" graph they keep repeating on the webpage and figure 6 in the report is straight up misleading.
This is the source:
What is different about different net-zero carbon electricity systems?
https://www.sciencedirect.com/science/article/pii/S266627872...
Utilizing storage costs from 2018 and then of course making the comparison against the model not incorporating any hydrogen derived zero carbon fuel to solve seasonal problems.
Which is todays suggestion for solving the final 1-2% requiring seasonal storage in the late 2030s.
Something akin to todays peaker plants financed on capacity because they run too little to be economical on their own, but zero carbon. Can be hydrogen or biofuel derived. We will know in 10 years time.
Would they have chosen the ReBF model the difference between made up optimal nuclear power and 2018 renewables would be: $80-94/MWh and $82-102/MWh.
It is essentially: Nukebros writes reports for nukebros, they confirm their own bias. Simply an attempt to justify another massive round of government subsidies on nuclear power.
(Submitted tile was "Google funding construction of seven U.S. nuclear reactors")
Sounds great in theory, but it took NuScale Power 6 years to get their design approved? I hope the AI hype lasts that long then maybe the world would have two certified 75 MWe SMR designs.
Also the NuScale Idaho plant was cancelled last year when cost estimates balooned 3x. 9.3bn for a 460 MWe plant?
edit: to be clear, 1GW of wind or solar is $1B. Build 3GW for overcapacity and you’re still at just 17% of the cost of 1GW of nuclear, and you technically have 3x more capacity. Now figure out how many megapacks you can buy for the $14B/GW you saved https://www.tesla.com/megapack/design (answer: 16GW/68GWh)
We have nothing close to the battery fabrication pipeline to make that timeline true, certainly not at scale. If this move works, Google will have cemented its power needs and economics for decades to come.
You need to pay attention because this is happening fast.
[1] https://www.bloomberg.com/news/newsletters/2024-04-12/china-... [2] https://www.iea.org/data-and-statistics/charts/lithium-ion-b...
Vogtle 4 was (IIRC) 30% cheaper than Vogtle 3.
The problem with nuclear in Georgia, and in the US, was that no one remembers/ed how to do it, and so all the lessons of yore had to be relearned, and the supply chain had to be stood up.
If you put in an order for several reactors, the very first one (especially of a new model, like Vogtle 3 was) will be expensive AF. The second will be expensive. All models after that will be at a more 'reasonable' cost.
Nuclear reactors are just like any other widget: the cost goes down with economies of scale. If you order 4 or 8 reactors at one sites they'll get progressively get cheaper (there is a floor of course). If you then put in an order at a second site, and move the workforce (or a portion) there, the lower costs will still be present.
If you start and stop construction, or order a whole bunch of different models/types, then there economies of scale goes out the window.
by the time they build it, the cost of renewables will halve, and their actual cost of nuclear will have doubled again.
No, it's not. Right now it's probably more than $10B a GW if you want the same level of reliability as nuclear.
And new AP1000s in the US would cost significantly less, because there are already experienced workers & supply chains from Vogtle and getting a license requires less work too, because you can copy much of Vogtle.
The median build time for nuclear reactors is 7 years. This is archivable if you continue building and not just build 1 or 2 every few decades.
Hence the batteries.
[0] https://www.fuld.com/tesla-energy-massive-growth-in-megapack...
Is the majority of that cost dealing with regulatory and legal nonsense that stems from the anti-nuclear hippy groups and laws they got passed in the 60s and 70s?
One part this, two parts the economics of a novel technology platform being deployed in a large size, three parts American labor costs and inexperience with megaprojects.
Similar to why we can't build ships [1]: high input costs, notably materials and labour, and a coddled industry that is internationally uncompetitive. With ships, it's the Jones Act and shipyard protectionism; with civilian nukes, it's misguided greenies. (Would note that we're perfectly capable of nuclear production if it happens under the military.)
[1] https://open.substack.com/pub/constructionphysics/p/why-cant...
> State-owned Electricite de France SA has raised its estimate for the future construction costs of six new atomic reactors in France by 30% to €67.4 billion ($73 billion)
6 reactors, 1650MW each, $7B per 1GW vs Vogtle's $17B. Planned. In 2 decades, after it's finally built, it will have doubled of course lmao.
The cost of nuclear in Georgia today is essentially subsidized by decades and decades of past investments.
And as much as some people might like that you can’t simply move Georgia and place it next to your data centers.
It's no conspiracy why nuclear never gets traction these days -- maybe it was cost-effective 10-30 years ago but renewable technology has gotten relatively cheap. (Shutting down active nuclear reactors earlier than needed is a whole different issue though.)
Here's the report for 2023: https://www.eia.gov/outlooks/aeo/electricity_generation/pdf/...
There is no report for 2024 because they are building a new model to take into account even newer technologies: https://www.eia.gov/pressroom/releases/press537.php
-- Edit --
To clarify, "Nuclear is a terrible investment for private industry in 2024." However, I understand why nation states (and their equivalents) would want a diversity of power sources. There many be non-economic reasons why nations want to build nuclear over solar+battery+wind.
> There's something to be said for space.
I see this argument a lot. Yes, the density is very high for nuclear power plants, but you need to build them in the middle of nowhere, for political and safety reasons. So, are we really saving space compared to solar? Plus, there is much less political resistance to solar farms, and almost zero safety issues (for PV).This comment:
> unless they're willing to bulldoze their entire land to cover it in solar panels
Your sentiment is interesting. No one says that when we talk about building new farms. Really, that is what people have done for the past 2000 years to alter our landscape. Can you imagine what Brazil looked like in 1800 vs today? Dramatic landscape changes due to farming. Same for US, Canada, New Zealand and Australia. California has plenty of desert or very unproductive land that can be covered with solar panels.1) Google uses about 25 terawatt-hours per year. Source: https://www.statista.com/statistics/788540/energy-consumptio...
2) An AP100 nuclear reactor can produce up to 10 terawatt-hours per year. Source: https://canes.mit.edu/overnight-capital-cost-next-ap1000#:~:....
That is incredible to think just how much power that a single nuclear reactor can produce!
This top-down corporate order will make more change than Americans can individually.
:(
That's.. not very much.
So typical of Google. Dip their toes in a new field. Get lots of press. Move on to the next thing.
Just tech virtue signalling: Google/Microsoft trade the impression that they’re relevant leaders for some legitimacy for a blue sky startup.
A frequent complaint from utilities has been AI companies refusing to sign PPAs. They want the option of picking up and leaving if someone else offers a better deal down the road, leaving the utility stuck with overbuilt infrastructure costs.
> virtue signalling
This term has lost whatever meaning it ever had if we're using it to refer to binding contracts.
If a technological solution is optimistic and remains vaporware possibly forever, then it maybe "virtue signaling" is if there more nonfunctional desire for it that outstrips practical or economic utility. A better term would be "vaporware" when there is less social puritanism involved, and I don't think coal or nuclear signal anything of redeemable greenwashing value compared to cheaper renewables combined with PES and distributed grid storage.
The flip side of being rich enough to hire good counsel is being rich enough to be worth going after. Were Google to renege on an agreement such as this, there would be a line of litigation financiers standing to buy the claim.
"Taking this to court will cost you a bajillion dollars. And you'll lose. Cut the antics and pay them off."
If they happen to pull through, it’s a drop in the bucket of Google’s overall consumption. If they don’t, then there is no downside for Google. This is not an investment.
Agreed that Google is taking on very little risk here, but it's still a good action and moves the space forward.
Then in certain political usage it became a nihilistic drive-by dismissal for nullifying any kind of virtue accountability, whether sincerely invested or not, a challenge to the idea that there was any such thing as sincere virtue discourse.
Without that commitment, the investment doesn't get made into the new power generation. Margins in that industry are much lower than in tech.
It absolutely is. Don’t know the details. But there is usually a minimum purchase guarantee by the buyer.
> If Kairos fizzles, more likely than not, can Google seek damages
Probably. Though collecting might be difficult.
> Will Microsoft seek damages from their binding contract when Helios isn’t grinding out fusion gigawatts in 2028 as promised?
Damages, no. Concessions? Probably.
NuScale has a more credible contract with the Carbon Free Power Project (“CFPP”) for the Utah Associated Municipal Power Systems (“UAMPS”). CFPP participants have been supportive of the project despite contracted energy prices that never seem to stop rising, from $55/MWh in 2016, to $89/MWh at the start of this year. What many have missed is that NuScale has been given till around January 2024 to raise project commitments to 80% or 370 MWe, from the existing 26% or 120 MWe, or risk termination. Crucially, when the participants agreed to this timeline, they were assured refunds for project costs if it were terminated, which creates an incentive for them to drop out. We are three months to the deadline and subscriptions have not moved an inch.
https://iceberg-research.com/2023/10/19/nuscale-power-smr-a-...Getting Google in line as a customer is absolutely huge for Kairos.
The B-17, on the other hand, ably earned her nickname, the "Queen of the Skies."
I believe Jigar Shah, the director of the Loan Programs Office at DoE, also talked about the importance of PPAs in attracting outside investment in his book Creating Climate Wealth: Unlocking the Impact Economy
https://ppp.worldbank.org/public-private-partnership/sector/...
That one is hard to support, given that the American aviation industry was the first such industry, anywhere, and was doing quite well for itself prior to the outbreak of the war.
Did the orders help? Um. Yes? I mean they stopped paying for the planes after Lend-Lease so, mixed bag there, there was a war on and all. But I don't see how the gulf between "Without Britain and France paying for a few planes before the war started" and "$50 Billion in materiel provided free of charge with most of the debt written off and most of the production destroyed in combat" gets bridged. I'm calling shenanigans.
The UK, France (especially), Italy, and others were way ahead of the US until the Feds made the Wrights share their patents to support production of arms for WW I. This led to the rise of far more innovative competitors in aircraft design and production: Curtiss, Martin, Lockheed, Boeing, etc., which rapidly eclipsed the Wright company's fossilized and already obsolete technology. (Note that Wright was soon more or less forced to merge with Curtiss...)
Do you think a weaker but more accurate claim would be :
"The US aircraft industry was considerably helped by French and British orders for World War II."
PPAs can be used as evidence of guaranteed revenue when raising funds in capital and debt markets.
That capital and debt is used to develop and deploy the technology.
While this has some advantages (low pressure, no fission products in the FLiBe), it also some issues.
First, the fuel cycle costs are higher than a LWR. The fuel is dispersed as small encapsulated grains in graphite spheres. Manufacturing the fuel is more expensive, I believe the enrichment needed is higher, and the volume of the spent fuel is considerably larger. All that graphite needs to be disposed of along with the spent fuel.
Second, FLiBe require isotopically separated lithium. Li-6 has a ruinously high thermal neutron absorption cross section so it must be rigorously excluded. It also produces tritium when it absorbs neutrons, which would permeate through the reactor and beyond. But there are no large scale lithium isotope separation plants in operation, and the technology that was used for this in the Cold War (to make Li-6 for H-bombs) has been shut down and cannot be restarted because of mercury pollution (liquid mercury is an inherent part of the process and much escaped down drains at Oak Ridge.)
Kairos has announced operation of a FLiBe purification plant, which sounds promisingly like an isotope separation plant, but it appears it's only a plant for removing other impurities (oxygen, sulfur, iron, etc.) from FLiBe. Isotopically pure Li-7 fluoride would be an input to this plant.
Third, FLiBe is about 11% beryllium. Annual world production of beryllium is just a few hundred tons. There's a limit to how much FLiBe could be made for these reactors (or for fusion reactors, for that matter.)
- "The Kairos Power fluoride-salt-cooled, high-temperature reactor requires highly enriched lithium-7 to support operations. The high enrichment requirements complicate quality and process control due to lack of qualified standards and instrumentation capable of meeting the required precision and accuracy. Currently, enrichment [sic] of 99.95% 7Li is imported to the U.S. in limited quantities."
https://gain.inl.gov/content/uploads/4/2023/10/KairosPower_A...
- "Due to environmental concerns and relatively low demand for enriched lithium, further use of the COLEX process is officially banned in the USA since 1963, which strengthens China’s near unanimous [sic] hold over the market of enriched lithium, followed by Russia.[7]. [...]Although US nuclear industry relies heavily on Chinese and Russian enriched lithium, ecological concerns over the process may impede its future domestic use at industrial scale."
https://en.wikipedia.org/wiki/COLEX_process#COLEX_separation...
(Tangentially, the Chinese FLiBe reactor also uses enriched lithium-7, so I guess they're self-sufficient in that, as both supplier and consumer).
https://en.wikipedia.org/wiki/TMSR-LF1
edit: Found an additional reference,
https://www.gao.gov/products/gao-13-716 ("Managing Critical Isotopes: Stewardship of Lithium-7 Is Needed to Ensure a Stable Supply" (2013))
I believe this is referring to rather small quantities (kilograms) imported for pH control in light water reactors.
On the one hand, I'm glad we're finally slowly letting go of the BigOil(tm) propaganda against nuclear. The fact that we're still burning dead dinosaurs to power our society and relying on windmills is insane to me.
On the other, a nuclear startup, presumably some VC-backed monstrosity who will only care about making the most money (aka cutting every conceivable corner there is to cut) possible, sounds like a recipe for fucking disaster just waiting to happen sooner rather than later.
Do you think SpaceX cut every conceivable corner to make money? Nuclear (and space), are heavily government regulated. It isn't perfect a safety net but it works.
If a nuclear power plant-owning VC-backed startup cuts corners because their shareholders expect 3 cents more of profit YoY on their earnings report, we get a nuclear meltdown that shuts off an area the size of a small city for a century.
These startups can barely keep passwords secure, I don't trust them and their VC psycho buddies for a second with something as potentially powerful as nuclear energy.
Not necessarily. Instead we could just have disposal containers that leak sooner rather than expected.
The storage and disposal side of the nuclear waste is still an unsolved problem, other than "just bury it and hope there's no contamination problems later on".
Sticking it at the bottom of a 5000ft mine shaft in a geologically stable region, with pictograms, is a solution.
If we lose the ability to decipher pictograms on the containers, we're probably back to being apes and have also lost the ability to mechanically dig 5000ft straight down, or 1000ft straight forward through rock, so we'd never encounter it ever again.
That's probably where our definition of "unsolved" differs.
To me, the concept of leaving something super toxic hanging around for the next several thousand years - more than double the entire existence of recorded western civilization so far - is "unsolved".
It's handing the (huge) problem to future generations to deal with. And doing so when there are alternatives already in existence that don't have the problem? That's (to me) not a rational approach.
This kind of proposal is not the direction to take for making the world better for our descendants, which should always be the goal of big decisions (and the goal of our descendants too). :)
That's exactly the point of government regulation, want to build a privately developed and operated commercial nuclear reactor? Requirement #1: it cannot be physically possible to have a meltdown.
Pretty much the same way jet liners have black boxes, round windows, no smoking, seat belts, etc. The FAA regulates and legislates that.
The irrational fear of nuclear power is just that.
Aviation is, as you pointed out, heavily regulated, yet that didn't stop the profit-seeking vultures from causing the Boeing-MAX fiasco. There are countless instances of private equity ruining everything they touch while covering things up to avoid repercussions for getting caught (if they ever even come), what makes you so sure this time it's going to be different?
VC companies have to meet the regulatory criteria. There aren't any safety corners that they can realistically cut without falling foul of regulation and inspection.
"Ideally, the steel cylinder provides leak-tight containment of the spent fuel."
Also guessing that article is woefully out of date since it mentions:
"The NRC estimated that many of the nuclear power plants in the United States will be out of room in their spent fuel pools by 2015, most likely requiring the use of temporary storage of some kind"
It's not too hard of a problem to solve, it just requires political will to bury it in a dry geologically stable desert somewhere in the US, which we have plenty of.
I have heard this before, but is this just the physical waste's volume? Isn't that a useless metric? What would happen if you included the volume of the containers required to safely house it?
Immensely more manageable than e.g. toxic, radioactive coal ash [1]. TL; DR Spent fuel isn't a real problem. We dispose of tonnes of similarly-nasty stuff every day without mention. (And unlike with radiation, it's difficult to indpendently check chemical toxicity.)
[1] https://www.wsj.com/us-news/coal-ash-cancer-epa-north-caroli...
This was always kind of interesting to me, and I'm surprised it's not mentioned more. Not for any practical purpose, but just because you'll often hear people talk about how radiation is super scary because it's "invisible". Which is the case, sure, but it seems like it's hardly unique? As you implied, there's countless chemical contaminants that are just as dangerous, and just as undetectable by human senses. At least with radioactive contaminants you can (at least in most situations) use Geiger counters and dosimeters and whatnot - with some of the chemical threats humanity has cooked up, it seems like you need an entire study just to determine if they're present or not.
Coal ash doesn't have that feature.
Not really. Even intentionally turning nuclear waste into a critical mass would take some effort, assuming it's been minimally reprocessed.
but the great thing about next gen reactors is that the waste solution does not need to be addresed; any waste from next gen reactors will simply go wherever the final solution for existing waste engines lands.
That's the thing, though: it doesn't need to progress, it's essentially solved. At least, for our current usage
A big non-safety disclaimer is that the proposed advantage of online refueling is still largely theoretical.
https://ukinventory.nda.gov.uk/the-2022-inventory/2022-uk-da...
A bit like all the world's gold would actually comfortably fit into an olympic sized swimming pool.
https://www.bbc.co.uk/news/magazine-21969100
Nuclear waste is a bit larger because it's not pure radioactive elements, but it is still a tiny volume.
Like, 1960 itself clearly belonged to the 1950's, the same way 1980 still belonged to the 1970's -- culturally, that is.
Obviously, the question of what year a decade "really" started in, allows for endless argument. :)
Not that I had a grand vision as, what was I, perhaps 7 years old? But communication and the transfer of information are two of the main things to live for. Neither seems boring or small beans to me at all
Glad you have one!!
We’ve had the technology to build and deploy nuclear reactors for decades but we’ve been burning coal and fuel like there’s no tomorrow so well…
"The best time to plant a tree was twenty years ago. The second best is now."
That proverb is ancient - it has been around for centuries (if not longer).
[1] Ancient Chinese proverb [2] Abraham Lincoln [3] Albert Einstein [4] 4Chat/Reddit/Twitter
https://insideclimatenews.org/news/10102024/inside-clean-ene...
https://coal.sierraclub.org/coal-plant-map
https://www.vox.com/climate/372852/solar-power-energy-growth...
https://www.dnv.com/news/eto-energy-related-emissions-will-p...
https://news.ycombinator.com/item?id=41602799 (citations)
Without evidence this is just a repetition of an old, unproven meme for internet points.
Maybe also look at value instead of revenue, in terms of public market caps or private acquisitions. At least Facebook's $1.48T market cap is derived from ads.
Development of generation III+ "fail-safe" reactors began to be developed around 1990's. To my knowledge none of them have had accidents like Fukushima.
Also Fukushima didn't result in any, or nearly no, deaths. However, I do hear of major oil catastrophes every decade or less. Deep Horizon accident in 2010 in comparison had 11 fatalities, 17 injuries, and spilled 134 million gallons of oil polluting almost the entire Gulf of Mexico.
According to Google the history of "fail safe" reactors is:
> Development of Generation III+ reactors began in the 1990s. The Westinghouse AP1000 was the first Generation III+ reactor to receive final design certification from the NRC in 2005.
Three Mile Island nuclear plant restart in Microsoft AI power deal
Caveat. I did pencil in data centres using nuclear as highly probable some years ago (I worked in geophysical energy+mineral exploration for decades then moved to resource intelligence presentation).
Won't I don't see is the "inadvertently saves us from catastrophic climate change" part .. sure, that might happen but it doesn't follow that it will - the more probable outcome is that overall we humans just consume even more energy with some of that addditional energy coming from nuclear.
It's a tall ask for nuclear to cover projected additional demand (see: global energy consumption data over time), it's even more of an ask to expect it to make inroads on existing demand also.
The closest thing we have for examples of nuclear at scale is Korea in recent past decades and currently China right now: https://itif.org/publications/2024/06/17/how-innovative-is-c...
Nuclear is also expensive in comparison to alternatives (depending upon local expertise): Australia's costings (cold start on nuclear power tech) are that the better ROI over next four decades on energy investment now is not nuclear (2024 CSIRO energy report).
And the TMI accident didnt really make any land radioactive and Fukushima seems cleanup-able.
"...the first one will be more expensive, the second will be cheaper, the third one is cheaper, the fourth one's cheaper. So it is objectively the case that if you went to a 1200 MW coal site, which by definition only has 1200 infrastructure around it, and you built one AP1000, that would be more expensive than building four 300 MW reactors, because the second, third and fourth one will be cheaper than the first one."
1. https://www.volts.wtf/p/nuclear-perhaps said that
Also claiming certain knowledge of the financial outcome of a large engineering project before one has even a prototype is pretty much the definition of hubris.
The podcast also says that there are 92 reactors operating in the US now and that one of the reasons why the US is so far behind other countries in the nuclear industry is that 'no four are the same'. So why not pick the most successful one and build a copy?
The word cheaper is doing a lot of work here. How much cheaper?
I'm not arguing that modularity is bad just that there doesn't seem to be any hard evidence yet that they will be truly modular, certainly not in the same sense as washing machines coming off a production line are. Look at how many rockets SpaceX built before they got it right.
Even production lines for much simpler things generally take some time to settle down. The idea that the second one will be noticeably cheaper than the first seems rather unlikely because it will have to incorporate fixes for the things that didn't quite work right on the first one.
Also a 300 MWe reactor is still very large machine and has to dump huge amounts of heat somewhere so the site is still important so making the individual reactors cheaper does not make the whole project correspondingly cheaper.
https://situational-awareness.ai/parting-thoughts/
There are some big differences with the atom bomb though :
A lot of people have been talking about AGI / the Singularity for decades, and that essay is yet another example.
Not sure if it's the hindsight talking, but the situation with (un)controlling fission was much clearer ? We knew it was at least theoretically possible. And the first test was very precisely engineered (in fact switching at the last minute to a more complex design because the calculations showed that the material wasn't pure enough to work). And the very first test worked.
Meanwhile, despite for AGI it (almost) all being out in the open, nobody can define what AGI exactly is, and it's all extremely empirical : throw compute at the wall, try another algorithm, see if the black box seems smarter, or not. Nobody knows even in theory when (or even if) AGI will be reached, and for how long scaling up compute will keep providing the very impressive results we have seen so far.
First line of the article is about how the company is trying to avoid spiraling costs. Yeah, seems like a great idea with nuclear energy.
So where's going to be the next Chernobyl? I read they have clearance to build one in Tennessee.
The main problem is that US needs to ramp down fossil fuel extraction and usage, and bring down per capita general electricity usage to levels resembling the rest of the western world. See eg this map: https://ourworldindata.org/grapher/per-capita-energy-use
CNBC article, no paywall: https://www.cnbc.com/2024/10/14/google-inks-deal-with-nuclea...
No battery farm can protect a solar/wind grid from an arbitrarily extended period of bad weather. If you have battery backup sufficient for time T and the weather doesn't cooperate for time T+1, you're in trouble.
Even a day or two of battery backup eliminates the cost advantage of solar/wind. Battery backup postpones the "range anxiety deadline" but cannot remove it. Fundamentally, solar and wind are not baseload power solutions. They are intermittent and unreliable.
Nuclear fission is the only clean baseload power source that can be widely adopted (cf. hydro). After 70 years of working with fission reactors, we know how to build and operate them at 95%+ efficiency (https://www.energy.gov/ne/articles/what-generation-capacity). Vogtle 3 and 4 have been operating at 100%.
Today there are 440 nuclear reactors operating in 32 countries.
Nuclear fission power plants are expensive to build but once built the plant can last 50 years (probably 80 years, maybe more). The unenriched uranium fuel is very cheap (https://www.cameco.com/invest/markets/uranium-price), perhaps 5% of the cost of running the plant.
This is in stark contrast to natural gas, where the plant is less expensive to build, but then fuel costs rapidly accumulate. The fossil fuel is the dominant cost of running the plant. And natural gas is a poor choice if greenhouse emissions matter.
Google is funding construction of 7 nuclear reactors. Microsoft is paying $100/MWh for 20 years to restart an 819 MW reactor at Three Mile Island. Sam Altman owns a stake in Oklo, a small modular reactor company. Bill Gates owns a stake in his TerraPower nuclear reactor company. Amazon recently purchased a "nuclear adjacent" data center from Talen Energy. Oracle announced that it is designing data centers with small modular nuclear reactors. As for Meta, see Yann LeCun's unambiguous comments: https://news.ycombinator.com/item?id=41621097
In China, 5 reactors are being built every year. 11 more were recently announced. The United Arab Emirates (land of oil and sun) now gets 25% of its grid power from the Barakah nuclear power plant (four 1.4 GW reactors, a total of 5.6 GW).
Nuclear fission will play an important role in the future of grid energy, along with solar and wind. Many people (e.g., Germany) still fear it. Often these people are afraid of nuclear waste, despite it being extremely tiny and safely contained (https://en.wikipedia.org/wiki/Dry_cask_storage). Education will fix this.
Nuclear fission is safe, clean, secure, and reliable.
Which is, hmm. Rather than impute motive, since I'm sure motives vary, I'm going to talk about why this doesn't work. Classic heat plants (coal, diesel, nuke, doesn't matter) get around 90% of the nameplate. Specifically they're running 90% of the time, and producing at the full capacity while running. That percentage is called the capacity factor.
Because for classic generators the capacity factor is high (hydro can vary a lot based on water available in the reservoir), nameplate capacity, which is what the plant yields under ideal conditions, is usually what we talk about. The problem is that the nameplate capacity of solar is what you get on a perfectly sunny day, with the sun shining directly on the panel.
What you want in order to assess cost is the nameplate capacity multiplied by the capacity factor, which is the averaged amount of power you can get out of the plant given real-world conditions. For solar, this can push 30% in an ideal location like Arizona, and be as low as 13% in a not-ideal location like Minnesota. Wind can push 50% capacity when well installed, but it is intermittent in an even less predictable way than solar. If the wind stops in the middle of the night, all wind and solar generation put together is bupkis.
We need nuclear. We could do without all of the other carbon-free electrical generation by use of nuclear energy. I don't think we should, mind you, solar in particular has a big advantage in that it's just about the only generating source which comes in small modules, so we can chip away at generation by adding whatever's affordable and build up over time.
But next time you hear that solar is cheaper, see if you can check the numbers and determine if the claim is being made on the basis of nameplate capacity. If it is, multiply that cost by four.
In one sense it does exist (i.e. it's buried in salt beds 2,000 feet below surface), but is it safe?
In 2014 there was an explosion of a waste container and radioactive particles were spread throughout the facility and up to the surface by the air processing equipment in the mine.
It seems like it's not just a binary choice, but more of a continuum of how safe is the particular solution compared to others.
No. This is a false dichtomy pushed, from what I can tell, by the gas lobby. It's solar and wind + nukes or gas.
Batteries work in theory but not in practice: production doesn't scale fast enough, and that was before LLMs brought a new and growing source of power demand to the table. (I'm ignoring that grid batteries compete with transport electrification. A combination of economies of scale and common bottlenecks in construction of battery plants, irrespective of chemistry, links the pursuits.)
In the last few years, they have displaced a huge chunk of the natural gas power used in early evenings after sunset when solar drops off but demand is still high.
https://english.elpais.com/economy-and-business/2024-08-25/b...
I firmly believe battery production can scale up very fast. Indeed, that's exactly what's been happening.
Realize that to replace all the motor vehicles in the US with BEVs would need enough batteries to store at least 40 hours of the average US grid output. This is almost certainly much more than would be needed for the grid itself.
Lots of people say either or. When nuclear comes up, someone will claim we should just go all in on solar, wind and batteries. That's unworkable, so we wind up burning gas.
For energy we obviously need all the options available.
If a major volcano goes off up and darkens the sky with clouds and high winds make wind farms unsafe to operate, then nuclear is probably our only reliable power source left. It's not like there weren't multiple ice ages and warming events in the history of our planet.
There is a reason sailboats were obsoleted by the steam engine: it could tug forward in windless waters and stll make it fast enough to deliver the mail. The base load power station is the steam engine. The sailboat is the wind turbine or the PV array. Most of them need a gas fired power plant to compensate for windless or cloudy days, like newer sailboats need an engine. We could use a load following SMR in place of the gas fired plant.
And the deadlines keep getting pushed because the fuel supplier is Russia. Nuclear is not immune to geopolitics or the weather as this comment suggests. It's one of the many issues comments like this ignore - like the spiraling construction costs (even in China), risk trade off when it comes to the catastrophic nature of accidents, viability and enormous costs of clean up and waste storage etc.
Which energy source has stricter safety and security regulations than nuclear? Surely the strictest security regulations are applied to the least safe and secure operations?
Which other source has cleanup operations going for decades, 1000s of miles from where a single plant operated? What other power source has the military guarding its waste?
The reliability seems great until unexpected failures drops a large percentage of the national power supply in a matter of minutes (as seen in France, Sweden and Finland for example). Such events are more disruptive than cloudy days are with Solar.
> Nuclear fission power plants are expensive to build but once built the plant can last 50 years
But they keep costing money for longer than the US has existed after they close.
Surely investing in hydrogen or similar is way better for the future than nuclear.
That's a failure mode common to all large centralized power plants, not exclusive to nuclear. For instance, an unexpected failure (a triple fault on one of the transmission lines coming from the power plant) of a single hydroelectric power plant caused a country-wide power outage in two countries (https://en.wikipedia.org/wiki/2009_Brazil_and_Paraguay_black...).
A better question is why nuclear needs that much regulation, it's all just political difficulties. Nuclear technology itself don't need this much.
I thought the answer was going to be a coal plant until I read the rest
Chernobyl is a bad example.
The Soviets knew it was an inherently unsafe design and built it anyway.
When you play stupid games, you win stupid prizes.
Fukushima is a better example.
It won't because people disagreeing with your view are not all uneducated morons. Their opinions are based on politics and ideology. And you can't deny that it's factually true that radioactive waste is generated. I personally don't think that this is problem compared to the alternatives, but others do and they're not just uneducated.
> Nuclear fission is safe, clean, secure, and reliable.
Wasn't Fukushima a nuclear fission reactor? How is nuclear fission secure?
And I don't want to hear the Fukushima partial-meltdown was operator error and we just need people to not make mistakes. I'd rather be told that accidents will happen, radioactive substances will leak, and we have ways to deal with that.
Renewables are intermittent and reliable; if a wind producer has bid into the day-ahead auction, you can expect with very high reliability they will deliver as bid.
Nuclear is great, so is zero-marginal-cost energy producers :)
It needs to come down by 85% in cost to be equal to the renewable system.
Every dollar invested in nuclear today prolongs our reliance on fossil fuels. We get enormously more value of the money simply by building renewables.
> The study finds that investments in flexibility in the electricity supply are needed in both systems due to the constant production pattern of nuclear and the variability of renewable energy sources. However, the scenario with high nuclear implementation is 1.2 billion EUR more expensive annually compared to a scenario only based on renewables, with all systems completely balancing supply and demand across all energy sectors in every hour. For nuclear power to be cost competitive with renewables an investment cost of 1.55 MEUR/MW must be achieved, which is substantially below any cost projection for nuclear power.
https://www.sciencedirect.com/science/article/pii/S030626192...
I would suggest reading the study I linked so you can see the difference in methodology when credible researches in the field tackle similar question.
The credible studies are focused on simulating the energy system and market with real world constraints. Which unsurprisingly works out to be way cheaper when not involving nuclear in the picture.
How does that follow?
How does using nuclear for some of our energy needs bias the rest of our energy sources towards fossil fuels? As opposed to renewables or even more nuclear?
Fixing climate change is both having enough energy to displace all fossil fuel we consume and being quick enough with the transition lessen the end state carbon content in the atmosphere.
Research safety and disposal. Add funds to that research so that we can get over our fear. We did it for airlines its time to do it for nuclear power.
Nonsense.
Such things can be regulated, but my point is that solar and wind are perfect for h2 generation. The sun shines? Produce. The wind blows? Produce.
The variability is irrelevant, and the result is the creation of a fuel source that can be stored.
Even better, we already have an immense network of Ng pipes, and there have been many tests and studies on injecting h2 into Ng lines, and pulling it out at the other end with molecular filters. There is no molecular reaction either.
The means low cost, massively deployed infra already exists.
And this massive network of Ng lines, with h2 injected, can in effect be an immense storage tank of h2.
We don't need some unified "batteries only" group think, but instead having multiple clean sources of energy is a boon. Just the cost of adding 3x the power transmission capacity, distribution is daunting, h2 can let a faster rollout of clean transport occur.
We should embrace all paths which the market can endure amd which can be green.
The Germans ended up focused on one only.
My point? H2 is perfect for solar.
Unscheduled maintenance intervals exist everywhere. This is not a unique problem.
> They are intermittent and unreliable.
On a 24 hour ahead basis. On a year to year basis, they're always available, and are absurdly reliable.
> And natural gas is a poor choice if greenhouse emissions matter.
There is nothing that can save you from being required to hold a broad mix of power generation technologies. Building a monoculture here is completely counterproductive and probably hastens the destruction.
> despite it being extremely tiny and safely contained
That container is mechanical. It has a failure rate. Failures never occur when you _want_ them to. Again, a _depth_ of strategies is appropriate here.
"Send it by train then bury it under a mountain and just forget about it" is not an actual strategy. It seems to work, because we probably just don't know any better yet, but the people who are uncomfortable are right to be so. Pretending that they simply lack "education" is a pretty rude point of view.
(Sadly, we have to consider that long because the current climate change is also unprecedented on these timescales.)
I am appalled though that anyone is seriously considering the idea of container-sized reactors, for which we can be nearly certain, if this seriously takes off, and we make million(s) of them, that hundreds if not thousands will end up abandoned in random places, and weathering will pierce them before they become radilogically inert.
Yes, any finite quantity is less than infinity. The same is true for fuel deliveries.
That isn't the only worry. If the fuel is smuggled out... https://spectrum.ieee.org/high-assay-low-enriched-uranium
What works much better is a combination of batteries and an e-fuel like hydrogen. Batteries handle most of the stored energy flow; hydrogen handles the rarer long term storage needs. They complement each other, in a way like cache memory and RAM complement each other.
It’s not there yet. CAES is cheaper than hydrogen today at grid scale, generally speaking : https://www.ctc-n.org/technologies/compressed-air-energy-sto...
CAES is likely going to be squeezed out by batteries, but hydrogen addresses the extreme storage use case (just a few cycles/year) where both batteries and CAES are unsuitable.
The pacing technology for green hydrogen is low capex electrolysers. China, as usual, is leading the charge on this. I understand 4% of hydrogen production in China is now from electrolysis.
Realize that global H2 production is enormous -- 75 million tons/year for pure H2, another 24 MT for hydrogen in mixed gas streams -- and much of this needs to be produced even when we're entirely off fossil fuels. Green hydrogen is not an optional thing. So all the problems of making and storing it are going to have to be solved. Once that's done, adding some turbines (very much like existing ones; it's likely possible to just retrofit existing NG turbines with new combustors) is not a large additional step. These turbines already have an after stage that reduces NOx back to N2.
Should not even be allowed to finance nuclear reactors before the long term storage facilities and recycling facilities
They made it their problem by law and forced the power plant operators (and thus the end consumers) to pay for it, but never delivered.
That's the only issue with nuclear, politics.
China and Russia use them quite effectively.
You dock them right on the shore and it powers an entire remote village / small city.
As another user pointed out, they've also been used by the US military for many decades to power carriers and subs without incident.
2013 - uhhhhhh never mind!
2024 - be evil!
So far economies of vertical scaling mostly led to cheaper energy than more smaller units.
Ideally youd have one company with a lot of skilled labor building NPPs all the time instead of only every few decades, because that means experienced workers change jobs/retire, supply chains cease to exist and this leads to cost and time overruns.
Still great to see finally more money being invested into this limitless technology (nuclear fission)
The idea that SMRs are safer is yet to be proven. SMRs have a scaling issue in that a larger reactor is simply more efficient.
Solar currently can produce about 1000 Watts per square meter (likely 200-400 in practice) so 500MW of power is going to be 1-1.5 square kilometers of solar panels. You can say it's varies in effectiveness geographically. That's true. But you can build your data centers pretty much anywhere. The Sun Belt, California or Colorado spring to mind [3].
Data centers just don't need a base load. You can simply not run them when there isn't sufficient power. Google already does. Its data center in Finland basically shuts down when it gets too hot. It's otherwise cooled by the sea. This was deemed to be more efficient than having active cooling infrastructure.
So 500MW of power is what? 4B kWh/year? In California, one benchmark I found was about 10kWh/year per square foot. That's ~4 square kilometers as a very conservative estimate.
[1]: https://blog.ucsusa.org/edwin-lyman/five-things-the-nuclear-...
[2]: https://cleantechnica.com/2019/04/16/fukushimas-final-costs-...
[3]: https://neo.ne.gov/programs/stats/pdf/201_solar_leadership.p...
Most of the extremely pessimistic total cost estimates are around $750B for Fukushima, and that's not the present value. That's money spent so far in the future the discount rate is substantial. Japan's official estimate is $187B, with probably a $100B NPV.
Chernobyl was an inherently (and well known) unsafe design. When you play stupid games, you win stupid prizes.
The cost of burning fossil fuels is estimated to be well, well over $1T.
Nothing comes for free. Pick your poison.
Are they the same as new large LWR, as in, must withstand a 737's impact?
This isn't the defense or retort that you think it is. This is from ONE incident. The industry recognizes the long tail of catastrophic failures is so large that laws have been passed to limit nuclear power liability in the US. I'm talking specifically about the Price-Anderson Act [1].
This severely limits nuclear power liability to ~$500 million per incident. That's a lot less than $1T or $750B or whatever figure you prefer. So who picks up the tab in a catastrophic event? Taxpayers. It's another example of how nuclear power can only exist with government subsidies. Yet we apparently want to trust private corporations to manage nuclear power plants and take the profits while shifting the risk to the public.
Additionally there's a self-insurance fund, but it would be completely inadequate to cover an incident like Fukushima. This is recognized [2].
> The cost of burning fossil fuels is estimated to be well, well over $1T.
So this is a strawman on two fronts. First, you're comparing the cost of a single massive failure by one plant to the entire fossil fuel industry. Second, I never even said fossil fuel power. I said solar.
[1]: https://crsreports.congress.gov/product/pdf/IF/IF10821
[2]: https://thebulletin.org/2020/02/the-us-government-insurance-...
1. There is too much money in the world for the investments (Massive QE post 2008 and post covid). Hence people with money want returns on tokens that say 10 dollars in the front instead of say 5 dollars
2. The externalities of nuclear power are not properly priced in (see Chernobyl)
3. The price of tax compared to services received for wealthy is again out of whack and so any investment looks good because the whole chain is not paying enough tax
All in all, I believe in efficient markets and price mechanisms - I just also believe people with power and influence bend the markets to their own needs and guess what they stop being efficient - hence the need for strong governments (not strongman governments)
1. We want to generate electricity with minimal carbon output. 2. Nuclear is part of this equation (along with solar, wind and tidal. Maybe one day fusion) 3. Nuclear has large capital upfront, a maintenance cost that requires us to always be on the A game, and the cost of catastrophic failure is fucking huge. 4. The other options have downsides of course, but their ongoing maintenance is basically lower because the catastrophe cost is much much much lower. 5. It’s really hard to quantify things like “major urban area made uninhabitable”, because it has almost never happened. But it can and it will if we keep chucking risk around like this.
6. The way to stop this, no the way to align investment, is to correct price externalities - positive and negative.
If we want to re- start places like Indian Point (a relative well Managed successful nuclear plant whose history reads like a series of disasters) then we ask what if Indian point failed like Fukushima.
That’s Westchester, and most of Manhattan that suddenly looks like a disaster movie. No Fukushima was not actually as deadly as feared (1 person kinda), but the evacuation and knock on effects. Try that on the Hudson and see what the cost of evacuating New York is - I mean, shipping, finance everything.
Honestly I struggle to see what’s crazy anymore.
How about every bond raised to fund a nuclear plant has a 100 year lien attached that no payments can be made till a century of safe operation and closure has occurred.
If the financials make sense after that I will take another look.
Nuclear power has almost unlimited downsides and fairly limited upsides.
It’s at least as expensive (and mostly more) to maintain a nuclear power station As any other form of (non-carbon) power generation - and the costs of catastrophic failure and orders of magnitude higher.
This is just back of the envelope maths. Cost to maintain a power station of X GW for 100 years is X, cost to maintain solar panels of X GW for 100 years is Y. Cost of total catastrophic failure in fifty years of solar panels because the country fell apart is small y. Cost of total catastrophic failure of fission reactor is huge great X.
The simplest analysis just comes up with huge downsides.
Look I take the train past Battersea powerstation most days. It was built 100 years ago at the height (?) of the British Empire. It became disused as Britain fell into bankruptcy in the 70s and was left to fester for decades before people realised a vast shopping centre in the middle of London was quite nice.
If it was nuclear it would still be sealed off, any slacking of maintenance, any cost saving too far, would fuck up the world’s greatest city .
And if you think the worlds most powerful and richest country could always afford the very best maintenance - let me introduce you to political decision making in the 1960s, industrial policy in the 1970s and human beings who tend to hope as a strategy.
It’s not hard to pretend the obvious won’t happen, and if you take the risk sometimes you will be right. And the cautious man will look silly.
But in the end Warren Buffet looks more sensible than Dick Fuld.
And even Warren is aware he pays far less tax relative to his maid. But it’s upto us to fix that just as it’s upto us to not make bad investment choices as a society that we will pay costly annual fees for centuries to come.
AI even if stuck to GPT 4~ levels has the potential to be usable in industries and outcompeted non AI users, as such, how can the US tell people that they shouldn't get nuclear power plants?
We'll sell you products and services that utilize AI and you are not allowed to get it yourself, is that the new model? It's no secret (I think?) that the US was behind many of the nuclear scare movements such as the green party in Germany as to avoid nuclear proliferation, for its own interests.
But if nuclear becomes required, and we are decades away from nuclear fusion...? what is the solution here? I'm genuinely curious.
Who is doing this? Last I checked, America has been trying to sell its AP1000 reactor.
> sell you products and services that utilize AI and you are not allowed to get it yourself
Every economy that can is developing AI.
> the US was behind many of the nuclear scare movements such as the green party in Germany
Source? German greens have a veritable track record of being idiots all on their own.
The US was exporting reactors all around the world. Most of those reactors are light water reactors using low enriched uranium fuel, its not that big of a nuclear weapons proliferation concern.