Most of their revenue is the subscription stuff, which makes it highly likely they lose money per token on the api (not surprising as they are are in price war with Google et al)
If you have an enterprise ChatGPT sub you have to consume around 5mln tokens a month to match the cost of using the api on GPT4o. At 100 words per minute that’s 35 days on continuous typing which shows how ridiculous the costs of api vs subscription are.
From my view chatbots are still in the "selling dollars for 90 cents" category of product, of course it sells like discounted hotcakes...
They make a loss overall because they spend a ton on R&D.
OpenAI’s potential issue is that if Google offers tokens at a 10% gross margin, OpenAI won’t be able to offer api tokens at a positive gross margin at all. Their only chance really is building a big subscription business. No way they can compete with a hyperscaler on api cost long run
This says 506 tokens/second for Llama 405B on a machine with 8x H200s which you can rent for $4/GPU so probably $40/hour for a server with enough GPUs. And so it can do ~1.8M tokens per hour. OpenAI charges $10/1M output tokens for GPT4o. (input tokens and cached tokens are cheaper, but this is just ballpark estimates.) So if it were 405B it might cost $20/1M output tokens.
Now, OpenAI is a little vague, but they have implied that GPT4o is actually only 60B-80B parameters. So they're probably selling it with a reasonable profit margin assuming it can do $5/1M output tokens at approximately 100B parameters.
And even if they were selling it at cost, I wouldn't be worried because a couple years from now Nvidia will release H300s that are at least 30% more efficient and that will cause a profit margin to materialize without raising prices. So if I have a use case that works with today's models, I will be able to rent the same thing a year or two from now for roughly the same price.
Unlike most Gen AI shops, OpenAI also incurs a heavy cost for traning base models gunning for SoTA, which involves drawing power from a literal nuclear reactor inside data centers.
No.
I wrote "inside" to mean that those mini reactors (300MW+) are meant to be used solely for the DCs.
(noun: https://www.collinsdictionary.com/dictionary/english-thesaur... / https://en.wikipedia.org/wiki/Heterosemy)
Replace it with nearby if that's makes you feel good about anyone's username.
Sorry for being rude.
This is fascinating to think about. Wonder what kind of shielding/environmental controls/all other kinds of changes you'd need for this to actually work. Would rack-sized SMR be contained enough not to impact anything? Would datacenter operators/workers need to follow NRC guidance?
The reactor does not need to be in the datacenter. It can be a couple hundreds meters away, bog-standard cables would be perfectly able to move the electrons. The cables being 20m or 200m long does not matter much.
You’re right though, putting them in the same building as a datacenter still makes no sense.
At some point it does make sense to have a small reactor powering a local datacenter or two, however. Licensing would still be not trivial.