However the lead time is going to be an issue: Need 7500 Tesla Megapacks and thats 4‑5 months of combined annual capacity for Tesla. Currently there is a 18 to 24 month backlog. Then there is 6-9 month installation time.
So 3 years to fix this, min.
It's a shame that these renewable energy transitions are managed so poorly. This was a predictable outcome and it's negligence that they went ahead with switching so much of the grid to renewable without accounting for the needed for stability. It hurts the mission of switching to renewable energy.