If they devise a grid tie system using a third rail to receive/transmit power, they could avoid placing a battery on the train and excess energy could be provided to the grid, which would be even more cost effective. Even if they opt out of connecting to the grid, the battery could be located at a stationary location rather than carried by the train, which should reduce the train’s permanent mass, lowering the size of the battery needed.