Hell F-35B does vertical takeoff and still mostly uses the same systems as the other designs, that should tell you something.
Hell F-35B does vertical takeoff and still mostly uses the same systems as the other designs, that should tell you something.
And without the F-35B, what would be flown by the US Marines, and by most other countries' aircraft carriers, all of which require vertical take-off and landing?
Reality is that VTOL model is ultimately a niche variant whose mandated commonality with air force and CATOBAR carrier variants impacted negatively both non- and VTOL options.
However, slapping supersonic VTOL requirement on what was supposed to be F-16 replacement in the given timeframe meant Lockheed would automatically get ahead as every other vendor had to scramble nearly from scratch while L-M had fresh supersonic VTOL data from both their own lab work and experimental work on Yak-141
> -B meant delays and issues
The -B was the first of the three variants to become operational.
And the delays were on the whole project due to forced commonality (in addition to L-M being L-M)
Do you really think anyone would be so stupid as to leave hard evidince? That's the magic of the whole process, they can do those things fully within the bounds of the process. They decide (or don't), often at the urging of lobbyists, or non-lobbyists parties who themselves typically aren't completely impartial, what they want. And often they have a specific product in mind that they want, but they can't say that so they write the requirement to all but say it.
Often times this is very reasonable and comes as the result of the end user having used multiple products or having used multiple contractors and knowing from experience with near certainty what or who they want.
In the alternate case where it's pork, this is often how upstarts get their start. Whoever the prime is doesn't wanna pay out the ass for someone else's pork that's been inserted into the requirements so connections get leveraged and several dominoes later a subcontractor to someone is under contract + NDA to buy a controlling stake in an idling paper mill and refit as necessary the small town's wastewater plant it dumps into because that is how they are going to provide the filter media meeting the performance specified in the requirements without being forced to pay out the ass for the product the lobbyists ghost wrote into it. The prime has basically entered into contract to create a company making a competing product out of thin air. There are many funny stories like this kicking around the beltway.
Conflicts between requirements of -A/-C and -B, among other reasons due to weight, were discussed as far and wide as GAO reports, because like with F-111, there was strong political push for maximum commonality, which resulted in cascading issues - for example, -B added 18 months around 2004 to -A and -C when the fuselage ended up too heavy for -B to operate with any equipment, and extensive rework had to be done on all models to shave ~1200kg. By 2010 there was discussion to cancel -B altogether.
On a topic closer to typical fare on HN, ALIS (IIRC now renamed to ODIN, but awarded back to the same team...), the ground support system critical to even running the airplane, was close to useless in 2015. Something that anyone with experience with that part of Lockheed probably expected and were not listened to.
Ultimately the aircraft is probably pretty good (I am saying probably because some crankiness isn't much talked unless you're actually embedded with users of such hardware, and is secret - there I have only my suspicions), but the road there was more painful than it should be - and ofc I would not trust it if I was foreign buyer for reasons of not just software black boxes but also dependency on US-located labs to provide mission data updates - at least I have not heard of that aspect changing. We used to joke it was first aircraft with "phone home" license system...
> the road there was more painful than it should be
See above - it's so hard to say. The conception was such an enormous project: build a bleeding edge system, higher performance than anything to be built for decades, even a new concept of fighter planes (as a sensor node on a network built around situational awareness, more than anything, as I understand it), that satisfies the requirements of not only the Navy, Air Force, and Marines, but a dozen militaries in other countries - and for all, critical to existential survival.
If you've ever had a project with more than one boss who are independent of each other, you know the pain of trying to choose even specifications. Imagine the F-35 meetings.
Was it worth the pain? It did allow an enormous economy of scale, a trillion dollars over its lifetime. They payoff is now, when it's the best fighter plane in the world that everyone wants, and a Dutch jet can land in Italy or Okinawa and get parts and maintenance.
But that doesn't answer the original question of whether the VTOL (really STOL) -B model was included mostly to give Lockheed the contract. In all those countries, there was too much demand for S/VTOL to just skip it, and there were and are zero alternatives. Something else could have been designed - but why when you can leverage all this massive development of the F-35?
> ALIS (IIRC now renamed to ODIN, but awarded back to the same team...), the ground support system critical to even running the airplane, was close to useless in 2015.
Also, I think ALIS was controlled and operated by Lockheed - it was essentially a service from Lockheed. The US military was limited in its ability to do its own inventory, maintenance, etc. Now the military insists on controlling the IP for its acquisition, to a large extent. I don't know what the IP status of ODIN is.
The entire pathway of F-35 in fact starts with Lockheed lobbying that their VTOL project could be stripped of some VTOL parts and serve as cheaper "addendum" to F-22, followed with merging the USMC-driven CALF with USAF/USNavy JAST.
As for ODIN, it's still done by the same people at Lockheed. And who used products from that division of Lockheed, does not laugh in the circus, as the polish saying goes.
Design iteration cycle-times should be decreasing due to CAD, experimental cycles-times reduced due to the proliferation of rapid-turn 5-axis CNC mills, experimental cycles reduced due to simulation, business processes streamlined due to advancements in JIT manufacturing and six-sigma/kaizen/etc, and so on and so forth. That this isn't occurring is a giant blinking red light that something is wrong, and that we are going to get our lunch eaten by someone who researches, designs, and manufactures with a modicum of competence. Ostensibly China.
Just the software for the helmet alone provides a huge technical advantage that has little to do with how the aircraft is manufactured other than having the appropriate sensors, communication systems, and computing power. Yet through all that bureaucracy what would normally be 3 different airframes all get to leverage the same systems without the need for retrofits etc. It’s inherently a two step process to figure out what you need before you can finalize the design.
By comparison vs the F-35, the B-2 spirit was vastly more expensive and far more limited. The F-35 also costs less than the more specialized F-22, but that versatility takes time.
That said, we could have made more than 195 of the them, but even at 750 it would have still been significantly more expensive per aircraft than the F-35 and it wouldn’t have let us cancel the F-35 program.
It would cost an insane amount of money.... but... It already does cost an insane amount of money, and then we have to run three separate military aviation programs for different regimes.
As to cost, in many ways a cruise ship is a better comparison than a cargo ship. The giant crew needed to maintain and operate a large aircraft fleet themselves need support staff, supplies, housing, etc. Carriers are expensive because of the people and systems onboard not the size of the ship.
Even just moving aircraft up and down from the flight deck requires a massive and thus expensive system. Civilian nuclear reactor are hideously expensive to build and operate let alone a system designed to ramp up and down more quickly, operate on a moving ship etc. Close in weapon systems have limited field of fire when you want a clear flight deck etc.
So sure, in theory you could just say we want a larger flight deck and are going to just have a number of empty components to pad out the ship but it’s not so simple.
Now that we do have the Third Locks, I think it would be reasonable to replace the bridges and make the alterations, a rounding error in the CVN budget.
The much smaller Wasp-class amphibious assault ship on the other hand can carry as many as 20 F-35B’s. https://en.wikipedia.org/wiki/Wasp-class_amphibious_assault_...
https://en.wikipedia.org/wiki/America-class_amphibious_assau...
New technologies should make iteration time on this stuff faster not shorter... even for complex things like fighter aircraft.
The fact that there are over a dozen Chinese humanoid robotics companies that have shipped working products in the past 12 months should be a big red flag.
I will say though that during WW2 and the Cold War, the amount of tolerance for killing test pilots was much greater given the number of people dying during active military conflicts at the time.
- DoD / DoW is a chaotic project owner, trying to squeeze in colossal and sometimes self-contradictory lists of requirements, which it wants to change often.
- The US government is a poor customer, which runs out of money from time to time.
- The US Congress is a cantankerous financier, which haggles for the money every year, and demands the production to be distributed all over the place, to bring jobs to the constituencies which voted for the congresspersons.
- The companies that produce this stuff are few and mostly cannot be easily replaced, and they know it. This is because in the late 1980s the US government decided that it has won the Cold War and will not need the many competing manufacturers of military gear any more. That proved to be a bit shortsighted, but now it's a bit late.
I think that mostly means money is cheap in China. In America, if you try to start a humanoid robot company you'll immediately run into the "Why though?" question when you try to get money for it. The case for the economic relevance of humanoid robots is dubious at best, so to proceed with such a development program you need your own money or at least good friends with connections who don't care about money.