> how much gas they need as an input to generate the 42MW
If you don't have a pipeline, the lower bound is something like 10 LNG tanker trucks per day for each turbine at 42MW. Natural gas is incredibly efficient to transport in liquid form so you could theoretically get away with this for a little while.