Field termination is necessary when the connectors are too large to pull through a conduit. But if they were USB-C sized, you could just pull fully assembled cables.
Every single time someone has provided pre-terminated cabling for one of my jobs to "save time" or to "make it easier", this provision has done neither.
Instead, it has consistently multiplied both the time required and the installation difficulty. It has done these things while also producing an inferior end result.
It is my anecdotal observation that it's NFG.