Building new power plants immediately isn’t really required to serve data centre, they’re huge amounts of spare capacity in most grids that only exists for extreme situations. The hard part is making sure any existing capacity can actually be delivered to the new data centre. New power plants will get built to rebuild spare capacity over time, or more likely, solar and wind will get built to reinforce that spare capacity over time.
Datacentres are useful grid loads because they all have backup power on site capable of powering the entire site as an island. Which means grid operators can ask them to disconnect quickly if they need to extra power for short periods of time to handle power spikes, or local grid faults. So it’s possible to connect quite a lot of extra data centre type load before generation capacity becomes a serious issue.