'Every millimetre counts': Inside the beast tunnelling under Sydney Harbour
smh.com.au
smh.com.au
But do they need the TBM to be milimeter accurate the whole way- or do they just need mm accurate surveying and very high accuracy when merging the tunnels?
It might seem inane- but they're two VERY different things.
A boring expert could talk all day about it :)
>The 6.5-kilometre motorway is due to open for traffic in late 2028, easing congestion on a key part of Sydney’s road network
For people interested in the background planning behind this, here's the video showing how it was done: https://www.youtube.com/watch?v=LTCZZBrhORs
[1] https://www.stago-us.com/products-services/hemostasis-system...