Currently for Datacenter's to move forward in Texas they must have some local power production so you see some of the newer upcoming ones featuring 20+ portable gas turbines on site. Others feature mixed solar/portable gas turbine.
Currently for Datacenter's to move forward in Texas they must have some local power production so you see some of the newer upcoming ones featuring 20+ portable gas turbines on site. Others feature mixed solar/portable gas turbine.
This is temporary because of the surge in power. Renewables will be built to handle the surge if it becomes a new baseline.
The equipment for grid connections is already 5 years behind in Texas. Are we talking about 20 or 30 years from now? Might as well be a lifetime.
You: Grid stuff is 5yr out everywhere
The article: Grid connections being years out is going to cause a huge increase in pollution because datacenters are setting up local gas operatings at the gigawatt scale.
I think a lot of people are missing the entire point. The next 10-20 years is going to have a huge spike in pollution (and CO2 release) that is going to affect humans and the grid at large.
The only way that changes is when those guys finally start to get themselves planted in the ground.