On the F-35 side, there was this huge robot that looked like a flat toolbox. It moved the airframe part from one station to the next. Just amazing. The whole assembly line looks like something out of a movie.
I was told that the F-35 had a lot of C++ code, and that is the reason it was not meeting deadlines. It was an interesting bit of gossip to hear, but I'm not entirely sure how that would come into play. I'm also not sure if C++ has been used before in this type of application. Given how ingrained Ada, C, and Fortran are in the industry.