Machinery of an Energy Dream: How to Keep Fusion Going Long Enough
nytimes.com
nytimes.com
I'm waiting especially eagerly in the case of laser-ignited fuel pellets, as to me it's like harnessing the power of a multitude of miniature discrete hydrogen bombs.
"ITER's goal is to produce 10 times as much power as is required for break-even" but what there going to be doing with it is testing different material blankets and magnetic control schemes plasma heating methods etc. There is also some concern about trying to stabilize as self heating plasma. (Of interest it's supposed go generate 500MW of thermal energy for ~10+ minutes so dissipating that is rather important.)
After that DEMO is supposed to be a working prototype fusion reactor.
PS: Jet reactor built in 1982 was reasonably close to break even. It was assumed we could build a working reactor next but it was simpler and cheaper to scale ITER down as much as possible which removed the energy generating side of thigns which is both expencive and well understood. http://en.wikipedia.org/wiki/Joint_European_Torus
We are making steady progress, and we're at least getting near break-even, but we're still a ways from rolling out Tokamak's as the one true solution. Frankly, I think the final solution may be a combination of strategies (magnetic confinement, inertial confinement, electrostatic confinement, and / or maybe one of the other ones, like sonofusion or the z-pinch).
However, the Tokamack confinement record is only 6 minutes 30 seconds. The neutron bombardment at scale is insane and grid power needs a steady and dependable energy supply, nobody has a ready supply of Tritium so they need to breed it somehow etc etc.
Worse even if we built something that was clean and net energy positive so are windmills so the reactor also needs to be cheap. Also, while far safer and cleaner than fission fusion still generates a fair bit of radioactive waste due to all that neutron bombardment.
The various scaling laws have pushed the minimum viable power plant size higher and higher. Now we are at the point where even if ITER and DEMO work out exactly as thier designers hope we will have "commercially viable fusion" that involves a monolithic multi-gigawatt plant that requires the bulk of its TCO to be made up front before any electricity is produced. That means profitability will be highly dependant on financing rates, construction time, and above all stable or increasing demand and prices for decades after construction begins.
Yeah, well, that's part of the problem with fusion. When it works once, it sucks all the profit out of the energy market.
That's why we do need governments to step in and fund things like this.