Walls are easy, cheap, and extremely fast to build.
Almost all the effort in construction goes into putting the fittings into the rooms.
There are interesting things you could do with 3d-printed concrete, like creating complex structures on-spec, but labour-saving just isn't going to be one of them - the labour costs of brick walls are minimal. It's the plumbing and electrics that get you every time.
Electric wires might be a bit tricky to "print". But I can imagine a machine that inserts the wires into the right places...
One day, you'll print a house with curtains and wooden floor included.
If you could do walls/floors/plumbing/electrics in one machine in one pass, it would change the world in ways that are hard to imagine - this would completely change the economics of construction projects.
Nobody's done those yet, sadly. They seem difficult things to design.
The issues I'm seeing are: no insulation, no interior framing for drywall and vapour barrier, no exterior framing for sheathing, insulation, building wrap or siding material. No plumbing, gas lines, wiring or ductwork.
The best this does is create an external shell that's still going to require a lot of processing to make it a commercially viable product. Minimum you would need to install a rigid foam, to apply a stucco coating, with construction adhesive just to be able to make it attractive as a home.
You can't even build a house from the foundation up with this. There's weeping tile and underfloor drainage that needs installing. There's water barrier that needs to go on the basement, there's damp coursing that needs to go on to prevent moisture travelling up the structure (rising damp) and there's adequate venting that needs to be installed in any masonry or concrete wall to ensure proper breathability so it doesn't rapidly deteriorate and cause damp in the insulation or rotting/rusting of the interior studs.
This is cool sure, but without the machine being able to install PVC and PEX piping for plumbing and conduits to run the electrical after, you're going to be waiting on humans to do all the work still and you might as well have two crews working rather than have a machine just idiling waiting for the meat sacks to be done.
A well coordinated house project goes very quickly. The issue is most projects are subcontracted and its waiting on a contractor to be available.
So... I bought a house to learn other skills.
This project is a fantastic proof of concept. The problems you listed could be solved with appropriate planning.
The open question is whether or not this has a market. If the cost is right, then this could be a great toy for children... or even in parks. Or just large scale art.
I'm starting my own company, so hopefully in over a decade I'll have it to a point I can take a hiatus to build my own house. I figure I can draft my son like my dad did when I was a teen (renovated a 1600s French farm house).
I agree about labor though.
All materials are delivered to the prefab factory, in bulk, the prefab house is assembled complete in about a week (including internal finish), and the house is delivered in a single delivery.
If you locate your prefab factories along convenient bulk shipping routes (railroads, rivers, canals) and order houses from the closest factory, you've reduced your shipping costs considerably.
I do really like this idea. I believe something like this, with some prefab parts that are automatically mounted could really get us one step closer to something like what Jacque Fresco envisioned http://en.wikipedia.org/wiki/Jacque_Fresco. I especially like his automated building tech which could combine prefab with foundations etc being built by a machine like this. http://thevenusproject.com/technology/construction
This manufacturer says No Manufactured Home built to the new Florida Building Codes implemented in 1999 went down in any of the hurricanes of 2004-2005.
http://www.leecorpinc.com/leecorp-faqs.htm#9
That's just the first interesting link I found searching on "hurricane double wide", and of course it is promotional, but what is important is whether the building is built to stand up to the storm.