The local utility is likely digging up the sidewalk now to properly ground whatever conduit might be generating the static electricity.
The local utility is likely digging up the sidewalk now to properly ground whatever conduit might be generating the static electricity.
https://www.reddit.com/r/videos/comments/2n0tkq/crazy_static...
Random hypothesis: it's a huge ionized-air antimicrobial filter running the circumference of a corridor that runs under the area, such that you instantly get "sanitized" as you pass through that corridor before entering e.g. a clean-room hardware assembly area.
I enjoy speculation like that, but I am comfortable making the following generalization:
Corporations worth billions do not run physics experiments in densely populated areas, targeted at public land meant for public use.
Disregarding that common sense, some other wild assumptions:
Use static electricity as a subconscious cue to pay attention to a billboard nearby. Pavlovian training, too--associate your brand with a tingly feeling?
Super-high-power RFID/NFC reading!
Make a positioning system with increased accuracy using strong magnetic fields
Gauge perceptive abilities by demographic groups, and willingness to experiment with curious physical sensations.
Usual standard is zinc-coated steel, 10mm (or larger, depending on stuff like attached lightning protectors, the diameter of the supply line and a number of other factors).
As mschuster91 said, there is always a risk of hitting existing lines when driving a rod in the ground.
When digging the holes for new telco FTTC boxes replacing passive-only boxes, we have to measure the quality of the existing ground, usually done with either 5-10m of 2cm wide, 3mm thick flat steel about 30cm belowground, or with a steel pole rammed ~3m into the earth directly next to the old box.
Usually the flat-steel is corroded and not usable any more (because the earth simply dries out), while the 3m poles are still good enough to use them.
In case the "old ground" is unusable, we tear it out (shit, that can involve LOTS of digging) and place a 1x0.5m steel plate at 50cm belowground, so that the bottom border is at 1.00m.
In the case of building a new grounder in an urban environment, I'd choose ramming a pole. It's easier, especially in areas with loads of wires and pipework - the downside is you have to rely on sometimes decades-old plans which can be off as much as two meters, and ramming a steel pole is enough to rupture a water or, worse, a gas pipe.
If a particular section of earth has poor conductivity it and has a charge you can imagine the charge can't escape. Maybe it is charged from lightning, a downed power line, friction in a pipe, etc. this is called ground potential rise.
If an area has low resistivity it can't create a steep potential gradient and the charge is spread out over the entire area.
a ground grid of copper conductor is buried under substations and power stations so that the ground on the entire premise is at the same potential. When a power line touches the ground the current flows back to the source through the ground to complete the circuit. If the ground has high resistivity and current flows through it there is a voltage difference from one point to the next. If those two points happen to be your feet you are a better conductor than ground. By laying the copper ground grid no ground potential difference can exist as the copper connects the whole premise with low resistance conductor.