Rock Hurling Is Old Nemesis of Train Crews
nytimes.com
nytimes.com
And just another wonderful example of why news organizations shouldn't print the names of people thought to be at fault until they learn the truth. Mayor Nutter had been saying some nasty things about this conductor and I'm sure a lot of people have picked up on it and have decided for themselves he killed those seven people. We don't know yet what happened. It was irresponsible journalism to print his name.
The mayor's comments aside, I think there is some balancing act, keeping a name out of the rumor mill is more or less impossible, so disclosing a name allows things like the police focusing on protecting one person (rather than trying to figure out who needs protection), and for a lawyer to credibly make statements on behalf of the person.
In some sense the problem is that society is capricious and reactionary, the behavior of the media just reflects that.
But if memory serves me right it was some nutcase with an illegal rifle.
Nothing about the outcome of all this, though.
In light of all the difficulty reported in installing the positive train controls which rely on trackside signalling equipment, I don't see why a GPS based train control system is not feasable, or at least one that gives instructions or sounds alarms in the cab. I'm only a layperson when it comes to locomotives, but my 2007 model Garmin GPS nav does tell me what speed limits are on nearly every road and warns me of upcoming turns.
http://www.businessinsider.com/the-amtrak-train-that-crashed...
The Wikipedia page for the locomotive does not discuss the control system:
http://en.wikipedia.org/wiki/Amtrak_Cities_Sprinter
Nor do a couple of the pamphlets listed in the sources there. Do you have a more concrete source for the deadman switch?
1) which track is the train on? GPS off by a few meters 1 way or the other means a different track.
2) What are the switch settings ahead?
3) Is there a train stopped ahead?
4) Is there any obstruction ( i.e. rock fall )?
5) Are the crossing gates ahead properly functioning?
6) Are there vehicles across the crossing ahead?
7) What are the normal speed restrictions in place?
8) Are there maintenance workers ahead?
9) Are there temporary speed restrictions in place because of tracks needing repair?
10) What is the mass of the train? Heavier trains = greater stopping distance.
11) What is the track surface - leaves in the fall can create a biofilm that increases stopping distance.
12) What is the cargo - some cargo requires more gradual deceleration - bottles of wine anyone?
13) What about tunnels?
14) What about mountainous terrain with poor line of sight to GPS satellites?
15) What about signals that may interfere with a GPS fix?
16) What about going through cities with buildings and in trenches?
Expanding on a few additional points:
"Where is the train in front of this train"?
a) Its not enough to know where the locomotive is: some freight trains can be 2 miles long. So if the train in front is 2 miles ahead but is a passenger train - no problem. A freight train? Big problem.
b) Is the train ahead on a siding that the current train will not hit because the switch is thrown to transfer to another track>
"What is the allowed speed?"
a) Is the train going to take a speed restricted curve?
b) Or continuing straight at a higher speed?
c) How fast can the train decelerate - freight is slower than passenger trains.
In a car its annoying -but having a train get confused and go into an emergency stop - that is something else.
Can your Garmin do any of this?
The article indicates that there are difficulties rolling out a full-service speed control system. Perhaps this tragedy will encourage them to roll out their bugfixes as they're implemented to whatever machines can accept them, rather than waiting for the entire release cycle to complete!
But its much more than just software - its hardware and different kinds of hardware as well.
Its also multiple different railroading companies from all across the country, with 1000s of locomotives. For example, a UP locomotive may be attached to a cross-continental train in Oakland and end up on the NEC 8 days later.
That UP locomotive would need to have the PTC hardware and software installed.
Using foreign power happens all the time. When a train crosses from one railroad to another, at most a new crew comes on but the locomotive stays with the train.
That new crew needs to know how to run the locomotive, there can't be wildly varying versions of PTC equipment onboard.
Now throw in all the leasing companies that have equipment of varying ages and abilities to be retrofitted.
And if life isn't complex enough, the NEC has 3 different electrification systems and a few short line railroads.
Railroading has a heavy, hard-fought focus on safety. Before railroad companies got really serious about safety - railroading used to be quite dangerous. They are not going to just "rollout" releases.
And to your statement about "not all of the issues need to be solved". Actually, yes they do because having trains just down or be slower than needed because of PTC is not reasonable either.
Consider this, a well functioning railroad has an average car velocity of about 25 mph. A railroad that is snarled with locomotives badly positioned, crews going outlaw in the wrong place has a car velocity of 21 mph or so.
Now you are going to throw in some half solution. Not. going. to. happen.
But, yes most random good Samaritans would be impeded. Not sure if that is bad thing.
When dealing with ground-level third rails for power, then absolutely: yes, this is good. Because unexperienced/panicking people might not know or forget about the power rail - and in contrast to an overhead line, a rail can carry significantly more current...