There's most certainly a cathodic protection system on the bridge for the rebars and supports exposed to seawater, however if pooling water wasn't intended in the lower areas then there was likely no CP active in the area - and the protection of the other members may have accelerated corrosion elsewhere due to stray current interference.
edit: It's actually the low voltage corrosion cells that you need to be cognizant of in such a case - most high voltage shorts fail before significant corrosion has taken place. Consumption rates for steel are in the kg/A-yr scale, and the concentration of the current dump is a major factor in general vs acute/pitting corrosion activity.