1,426 karma · joined January 20, 2022
Germany could recycle all that waste at la Hague, build a repository Like Onkalo and still have leftover money. If for some reason KENFO isn't enough, chiefs of BMUV and BASE should be investigated For treason and wasting public money. Germany could even deal with this cheaper by allowing storing the waste at facilities like herfa neurode. This would also solve storing waste from medical and research sectors
China doesn't have free market in the way we have it anyway. It wasn't valid even for solar
The cheapest way in Germany would be either to allow storing in Herfa Neurode or to send waste to la Hague for recycling, sell the recycled part and isolate only the leftovers.
Renewables don't isolate you from this problem. Germany still needs a repository for medical and research waste. Germany also needs repositories for toxic chemicals (arsenic, cadmium, lead- byproducts of various industries including renewables)
Even more, Germany can't get by with solar+wind+bess alone. Fraunhofer ISE recommends massive gas expansion to 80+GW to firm renewables. I'd rather see any fossils infrastructure erased from existence. France doesn't need a parallel fossils firming grid. Nor Sweden.
Ren infra has own risks too. For example concentration in best weather areas. Most ren infra in Ukraine was in the south and was either captured or destroyed by Russia. There are similar risks in for north sea/offshore projects
I'm sure Framatome will be more than happy to help with manufacturing of necessary parts. Great carenage is already undergoing in France which helped in this regard but Framatome is involved in manufacturing for other suppliers too
Sourcing uranium is not an issue. In fact per kwh nuclear requires least amount of materials and hence, imports https://ourworldindata.org/low-carbon-technologies-need-far-... Heck Germany can even extract it from seawater in worst case. Nowadays it's not that much more expensive vs land mining. But soon Sweden will be a player too, along Canada/Australia
Npp in germany were insured by law with insuring pools. On top, operators had full asset liability, again, per law. Closest catastrophe event would be TMI. Cleanup there is merely 1bn...
Russian war shows nuclear is great regardless. Ukraine's grid still has power even though most ren infra got destroyed/captured because most was deployed in south with better weather. Germany is in similar situation with northern offshore parks
You remember chernobyl which is expected to kill at most 4k ppl or much less per UNCSEAR but you are probably fine with german car industry which kills same amount of persons in merely 2y from impacts, right? You are fine with coal still operating which killed even more? You are fine with gas being used for firming? (habeck, reiche, fraunhofer) Phaseout was a terrible decision https://link.springer.com/article/10.1007/s10640-025-01002-z
France has decentralized grid with centralized multiunit locations. This reduces heavily grid investment needs. There's a reason Germany spends 10x vs France on transmission and curtailment
It can be turned on by pursuing refurbs like Darlington in Canada which would be closest conceptually since a lot of stuff got replaced there. Refurbs would be cheap vs building anything new providing same TWh/year. Germany needs much more than just batteries. It needs gas firming on top (coming from Habeck, Fraunhofer and now Reiche)
Nuclear waste storage is politically killed centrally. Look even at formulation in the law which demands "best" location. Germany could solve this problem in a second if it allowed storing waste in facilities where toxic chemicals are stored like Herfa Neurode.
Asse was an experimental facility that didnt have a plan of what to do if experiment goes sideways. It has nothing to do with final repositories like Onkalo. Still, it killed noone. Nor will it. Most of the waste there is from medical and research sectors and is LLW.
EDF isnt crying. It's just treated poorly even by looking at ARENH tax which was replaced with another one this year, while ren business gets CFD's and curtailment payments.
French nuclear fleet is extremely flexible, RTE data is public. In fact, due to ARENH law EDF was forced to subsidize competition because otherwise that competition would not exist.
www.kkg.ch/de/uns/geschaefts-nachhaltigkeitsberichte.html
https://www.ffe.de/en/publications/merit-order-shifts-and-th...
But chinese nuclear is built faster and cheaper vs our units even during messmer in france. So their price guarantee is lower too. Probably similar to what distributed solar got there of 0.4y/kwh in the past. Albeit subsidies for solar were cut last year to stimulate a healthier growth
Most of the waste in asse is from medical and research sectors
Waste is irrelevant for bombs due to parasitic isotopes. You clearly have zero idea about the topic.
France pays no subsidies(yet, epr2 is another topic). In fact EDF was forced to pay a tax till this year called arenh to subsidize competition. This year that tax was replaced by another tax. Many read the law wrongly about 70eur. It's not that EDF will get guaranteed CFD. It's that EDF will be forced to pay EXTRA tax IF it sells above that limit. French prices dropped both in 2025 and now in 2026. French households have lower prices vs german ones per eurostat.
Basically all your statements are nonsense antinuclear rambling