Setting aside land/planning/regulations/NIMBY/unions, for a repeated build, what is the build cost of a modern 3 floor x 4 apartments = 12 apartment building ?
565 karma · joined January 15, 2018
Security, algorithms and algo trading since 19XX..
Setting aside land/planning/regulations/NIMBY/unions, for a repeated build, what is the build cost of a modern 3 floor x 4 apartments = 12 apartment building ?
What exactly is being shown on the map ?
And which libs did u use ?
> We follow. We do not have valuation rules (clearly).
> We prioritize 2nd time founders, rev traction, and fancy co-investors.
So these valuations are for the best 10% of YC, which is the best accelerator. Nice if u can get it.
Or maybe growth is accelerating, and those who passed on series-A are upset?
Or maybe the lizard men are involved?
Its just sad to see such a negative article.
There are, however, fair questions about valuation and (lack of) moat.
This is usually under "C&I" (commercial and industrial), as opposed to rooftop or utility scale.
Try Lazard LCoE report, NREL Solar reports, IRENA renewables, or use google.
thanks. lots of good details in this thread.
> if by AC you mean 50 or 60 Hz, definitely can and should be avoided.
Yes, i meant avoiding the maintenance and losses of an actual transformer
Can a mega pack battery output be converted 10kVDC without an AC step ?
Do BERTs models learn faster than GPTs?
Assuming the task is predictive, BERT seem to have a stronger/richer signal (obviously in practice you have use existing pre-trained models)
Also South Australia grid (~1GW) has been running at 90% renewable for months, and recently 99% with some new hardware.
It is true the last 10% will be very hard, but luckily we have engineers.
This seems wrong. I believe that green HB process would be 80%-90% efficient since the heat is re-used? I have read conflicting papers.
Of course, HB is still a capex-heavy process.
Maybe the 40% number is for fossil methane to ammonia?
> Taiwan, with US support, would be able to hold off
..
>“The United States and its allies lost dozens of ships,
> hundreds of aircraft, and tens of thousands of service
> members. Taiwan saw its economy devastated.
[1] https://www.bloomberg.com/opinion/articles/2023-01-21/what-w...
I will be PM with some thoughts and hope to hear from you.
Can you please elaborate on the scaling costs ?
I have been told that packs will output 400vDC as-is. But turning this into a grid AC connection is "complicated" ?
Also - not clear where they spent the initial $200M. Maybe it already includes the land lease ?
that sounds horrible. What do you mean by this ?
I assume by "sweeping" the GC meant transferring funds to a bank outside of PP?
Is it a library/backend/hosted-form? (For just $499 - you save $500!!!)
Is it a payment gateway? Do they spare you the need for pp/stripe/CC account ?!
I cant possibly image what the other 90 plugins do...
What is the state of Cordova these days for a typical reactive webapp ?
Going to Mars is a legitimate goal.
But i would also like to see a make-the-Sahara-green-(ish) program.
Why not a Neom-but-in-a-viable-way program.
ALso, an even bigger debate is Appolo-mission-to-Mars vs 10-other-unmanned-programs-for-the-Solar system.
EDIT: numbers..
2/ Do you think there is a future for robot cleaner? Some new companies are already 90% down from recent SPACs.
Sure, Sequoia wants to hear all about your great startup proposals.
And it will (rightly) reject 99%, and finally fund a "known team that can execute" kidding not kidding
But what happens as you start adding stuff. Toaster notification, user badges, swipe actions.
I an not a JS expert, but it seems a modern library will have these built in ?
EDIT: would be interesting to hear the original poster's opinion
Can u share how long it took to build and what is your day job ?
Was there ever any formal waiver or guide lines?
The eco-system seems fragile - easily destroyed by over grazing, or even simply from tourists or visitors
Also labour intensive - he mentions 100 labourers x multiple years.
So these projects would need government regulation and protection.
There are just crossing 500m at 2-3 knots several times a day.
This is basically less than a semi rolling resistance which is maybe 1/5kwh/km?
EDIT: even so, x10 batteries 2mwh are still very reasonable for a boat which cycle daily
Is it possible to have a 10KV x 100A power tether snaking around like this ?
There is a whole basket of safety requirements which kick in with higher power scenarios
Is it just a notice board (like product hunt) where you get some exposure? Or do you pay for it (other than offering a bargain discount..)?