1,774 karma · joined January 2, 2014
humans can dissipate 360W easily, though not necessarily comfortably.
that being said, the power usage is high. assuming uniform absorption, 4w/kg works out to roughly 200mw in the brain. here's a neuro paper that sets an optimistic limit at 40mw.
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC3807567/#B34
OTOH, we pump a lot more than that (relative to mass) into fly brains during imaging, although they're not expected to survive much longer than the imaging session. the laser in our lab is about 1w, after losses from the optics path and pulse picking, the power on the brain is usually around 20mw
why a developer would be against something that increases real-estate prices is beyond me
there are a lot of reasons why dramatic expansion (of the kind needed to take the edge off climate change) of hydro power isn't feasible. for one most of the suitable sites are already used. and the environmental impact is substantial
https://en.wikipedia.org/wiki/Onkalo_spent_nuclear_fuel_repo...
smells like $$$ and more delays. nuclear is already by far the safest method of power production, and emits far fewer radionuclides than coal, and those numbers are the old generation more dangerous pressurized water reactors.
water's lapping at our feet
probably the example in the bay is the dumbarton line, which has been preserved and in a world where CAHSR wasn't politically compromised would be the route off of the caltrain towards the altamont pass. the altamont alignment is technically superior to the chosen pacheco alignment on all metrics (cost, speed, operational constraints), but pacheco was chosen due to lobbying by san jose politicians, who, suffering from a massive inferiority complex, demanded that podunk san jose's diridon intergalactic was on the main line and not served by a branch. that decision, btw, pretty much single-handedly compromises the utility of CAHSR. it severely constraints the tph into SF, makes the SF-sacramento trip uncompetitive, and adds billions in unnecessary infrastructure costs
another example is the vasona branch, which branches off the caltrain right of way around cal ave, and slated to be used for a BART line to los gatos during the early days of BARTs development.
> Note that if you travel from The Netherlands to Spain you might be traversing 6 different railway electrification systems that vary in critical stuff like voltages (and by more than a factor 10!) and possibly Hz, and some are AC and some are DC (not kidding). Also there will be at least 2 incompatible track gauges involved. And I bet other stuff like communications and routing systems are incompatible and safety critical too.
none of this is nearly as problematic as you seem to think it is. modern powertrains traverse various electrification schemes without difficulty. signaling systems are trending towards ETCS, trains that traverse incompatible signaling systems (eg the eurostar) simply carry a set of onboard signaling equipment for each standard. gauge changes are the most challenging technical limitation in your list, but are a solved problem. spanish talgo's regularly change gauges at speed [1]