11,592 karma · joined October 21, 2013
Stuff like gas town is dead in the water
1) the first MW is cheaper to generate than the 100th. Newer plants. Cheaper fuels. More efficient. You run your good stuff always, for peak it’s on demand.
2) the cost of the old plants are already paid for, if adding a new data center requires a new plant; may add a big cost with a 50 year payback.
The race to tolerate lots of carbs is usually something you think of in 8 hour Ironmans. The good part is you can do most of it on the bike, which is much easier to eat as you go. As far as I know, many elite runners were doing like 50% water, 50% sports drink and consuming way under 100g.
NYC has no allys. Trash goes on sidewalk. Streets smell stinky.
My entire stack is.. k8s, hosted Postgres, s3 type storage. I can always host my own Postgres. So really down to k8s and s3. I think hetzner has some kind of s3 storage but haven’t looked into, and I assume moving in 100 TB is a process….