957 karma · joined June 14, 2021
I was a Product Manager for a mesh based personnel tracking system on construction sites. We licensed Wirepas's tech for our solution... wound up learning a lot about the nuances of meshes.
These would also be handy in construction when you're deep in the bowels of a new building and can't get any reception whatsoever (cell, CB, etc.)
Setting up a company is a quick process HOWEVER getting the business to a state where you can transact legally may take a while if you need special licenses.
Also, EDB in Singapore can provide quite a bit of support for SG companies. EDB can set up meetings in foreign countries for you to help drum up business.
A lot of Brits I met in SG also had BVI companies.
The US system sounds totally broken compared to my experiences within the Singapore and Australian health care systems.
Work beyond 50 hours required approval from your direct manager. Work beyond 55 hours had to be approved by the next level of management. Beyond 60 hours required approval from the highest level of plant management and was usually only approved during commissioning when you have no choice but to start your testing at random hours of the day or emergency scenarios.
Let's go through the whole process. You need a system changeout for a ducted central HVAC system. Someone comes over and gives a bid. You accept. Your HVAC person needs to go to a supply house and purchase all of the parts and bring them to your residence in a vehicle than can hold everything.
Assuming you have an existing system, the refrigerant has to be recovered with a special recovery pump. You can't just dump refrigerant to the atmosphere. This can take an hour or so.
You've got to find the right breaker(s) and then turn them off. Disconnect the power wiring. Then you've gotta disassemble the old equipment and remove it. Next you move in the new equipment. Rewire the power. Rewire the controls wiring. Assemble the new equipment, assemble plenums, cut holes in plenums, install collars, run duct work from plenums to boxes, attach and seal all ductwork with tape, mastic, etc. You need to strap up the ducts to properly. You still need to solder the line set at this point.
If your new equipment runs on a different type of refrigerant, in all likelihood, you need a new line set (the copper tubes that transport the refrigerant to the evaporator from the condenser and back). Why? Different refrigerants have different working pressures, may require higher flow, etc.
Once you're lineset is soldered back to a condenser AND the evaporator, then you must pull a vacuum on the system to A) remove non condensable gases and B) dehydrate the system so that your refrigerants are clean and the system is efficient. Properly pulling a vacuum is very time consuming. Most guys start by pulling an initial vacuum and then shutting in the system to do a leak test. You may find a leak, this takes more time. You need to repair the leak, then pull another vacuum. Once you past leak test, you pull a final vacuum. You don't want installers skimping on this step as this affects the overall lifespan of the system and system efficiency.
At this point, you can start the system (I've had new units dead from the factory... groan), then you can start charging the system with refrigerant. You need to let the system run for a bit to monitor pressures, monitor return air and supply air temps, etc.
Once the job is done, all of the old equipment and refrigerant has to be taken to specific places for proper disposal.
Everything above is a generally straight forward non-permitted replacement. Other installs may require new circuits run to the equipment, natural gas lines, etc. Some jobs require permits so now the HVAC person has to go to the city, apply for permits, submit plans, have the work inspected, etc.
There's quite a bit of work that has to be done which requires transportation, disposal, specialized knowledge, expensive tools, employees, and most important of all, insurance! Also, keep in mind that a lot of this work is done at temperatures FAR beyond ambient AND in low clearance areas, usually filled with itchy fiberglass. This work is also done with risk of bodily harm (electrocution, poisoning (hello phosgene gas), suffocation (asphyxiation from refrigerants), heat stroke, falls from height, exposure to industrial pollutants like asbestos, burns).
Could you describe that more? As in the sensation?
I routinely get blood pressure spikes in the late afternoons. It's hard to describe but when it happens I feel like I need my vision to "zoom out", it's almost overwhelming / fatiguing to maintain what I'm looking at. I feel "spaced out" cognitively when this happens.
I'd say nearly a 3rd of the content on my instagram is food based, either people food tourism or cooking. Insta is by far my favorite channel for food content. I think Laurent Dagenais does a great job appealing to young and middle age people... good production and recipes, usually some level of boozing through out the video, and good background music. Definitely has a "fun" vibe.
I live in the northern beaches area of Sydney and a "knockdown rebuild" can go for roughly $2m-3m AUD ($1.3-1.9m USD). I struggle with real estate prices here.
I'm American and live in Oz. Australia does this well imo. Small cafes and shops are sprinkled throughout neighborhoods. For any large grocery runs, I need to take my car but day to day basics (and more importantly...coffee) are within only a few minutes walking distance.
My grandfather was an engineer for NASA from the 60's-80's. They were able to have a primary residence in Houston and 2 holiday homes around Texas and put 3 kids through college on a modest single income.
Could I do the same today on a modest engineering salary from a government agency? No way.
And there's the issue. CPI is arguably doctored to downplay inflation.
On the extreme cold side, you can use heaters to warm up your components to boot temperature, however if said component is connected your heatsink you are fighting a losing battle.
Power is the killer, and it's doubly bad. Not only is it expensive, you're using a lot of power to keep things cool given ambient temp fluctuates typically between 24-33C, 60%-90%Rh 24/7.
There was a moratorium on new DC builds in Singapore, so there's also a huge demand/premium on rack space in SG.