It would probably have been wiser to keep the nuclear shut-off at 2030, but Fukushima changed that and when the energy crisis hit it was already too late to change course.
Except they are not being replaced? Just like in the good old days™ you can still get out and collect the herbs you're looking for. It's just that nowadays we know that component X of a herbal remedy actually does the job so you just buy that in tablet form (or whatever) instead eating of the whole thing.
Hinkley Point C is currently expected to cost around $31 billion once finished for a measly 3,000 MW.
For that money you could build ~2,300 15MW onshore wind turbines - which would add up to roughly 34,500 MW capacity. So even under the assumptions that
- you have to replace the wind turbines 3x to reach 100 years life span and
- you always have to build more renewables since they don't run at 100% their capacity throughout their lifespan
wind make more sense economically nowadays.
After all we already have a giant fusion reactor just 12 light-minutes away from us! We just have to harvest that energy. The direction were already going (mostly market-driven nowadays actually!) is generation from renewable sources, flexible grids and storage systems to balance everything out.
[1] https://www.europeanpaymentscouncil.eu/what-we-do/sepa-insta...
That's a problem already solved: Storage. Germany alone has 3.4 GWh of home-battery storage installed as of today. And it's constantly increasing. Averaged over a year, renewable energy sources operate at about 30% of their capacity. So even in a worst-case scenario with no storage whatsoever you would need to build 3x "overcapacity".
> We should have some renewables but we can't base the entire energy supply on them.
We surely can and will! Mark my words.
Unintuitively though, this is incorrect - both for France[1] and the US[2]. Building subsequent versions of the same reactor design increases the cost - instead of it staying the same or going down.
[1] https://www.sciencedirect.com/science/article/abs/pii/S03014...
When finished the UKs Hinkley Point C nuclear plant will probably have cost around £23 billion for ~3.000 MW which is completely insane.