The quarter that burped also had the problem that IT was late transitioning the ERP system from the HP3000 setup while a new product mix was brought out: the final set of the Sun 3 line (including the 3/85)powered by the MOV 68030 and the SPARCststion 1.
Marketing had guessed wrong at the mix (SS1 was ordered in far larger volumes than had been built, while 3/85s and their cousins languished on the shelves), but the ERP system wasn’t ready, so Sun management was flying blind.