1,722 karma · joined January 3, 2013
I do use Outlook for diary management but that's because I work in a corporate environment and trying to do anything else would be working against the system. But it's one calendar for everything (work and personal).
Jarrod
But will it move everybody back to download versus streaming. Be interested to know how much of streaming start time is network time to first byte versus authenticate/authorise/check geo-fence admin activities? So would be slightly faster start time and may be less likely to degrade. However, streaming operators if they switch to download are going to have to deal with sending bytes that are never watched. Would be interesting to know how much is downloaded from Amazon Video that is never watched.
> These machines will have to communicate almost in real time with everything around them to avoid cyclists and other obstacles. That can happen only if carriers offer one-millisecond latency, something that may become a lifesaver if autonomous cars become a reality.
Will only be possible if there is a guaranteed quality of service. Would be interesting to see how your EULA/T&C of mobile service are written/rewritten to cover life critical usage scenarios.
> ability to go online no matter where they are, forcing operators to extend their networks to practically every corner of a country.
What sort of frequencies are available to 5G and how will that propagate compared to other options?
[1] http://www.bsigroup.com/en-GB/bs-10008-electronic-informatio...
When we got called out we were well recompensed at minimum of two hours of 3x hourly rate. If you resolved incident in 10 minutes you still got 6 hours of pay. If you got another call within those first two hours then you didn't get anything extra until you were working for 2 hours and 1 minute , but if the 2nd call came in after 3 hours you started the clock again. During times of instability (new code release) we often had management agree to you working from first call-out until the day shift came in to order to minimise downtime. When we were working during the night the on-call always had priority, but if you were sat around waiting for the system to do something then we all did something else to keep us awake. But there was no expectation that it was other tickets or project work. We made personal choices of doing day work or it could be crossword puzzle etc.
We all had areas of expertise and if you caught something you didn't know how to resolve then we had the authority to ring anybody. And that person would also receive the same compensation. In 5 years doing this I never had a complaint from calling somebody else out. Did we get tired yes? Most of us had project roles or team lead roles during the day but we all knew that the production system had priority and we and our own line management would deal with the project work accordingly. Did we get burned out on this? No because the rota meant that you still had a life. If you were top of the list and had other commitments that night you'd negotiate coverage with somebody else further down the list to see who could go top for the night.
My employer did this because the cost of not doing and having downtime during the day was a lot higher. If the system failed out of hours then it could impact our business and we could lose c.8,000 hours of day shift working time that would still require salary payment. Plus reputation damage etc. Most I ever accumulated over a weekend was 32 hours at 3x (situation so bad required to restore database to last known good and then catch-up log files).
One night I also got it wrong and in trying to correct the incident forced us into a situation when we had to do a database restore. That caused about 4,000 man/hours of downtime. When my bosses boss came in at 6:30am (he got called out by my boss) I got sent home being told I was too tired to continue support, day shift staff would take over and the missive to ring him when I had slept. I made the phone call expecting a significant dressing down only to be told, everybody else who looked at the diagnostics said they would have done exactly the same, we've all learned, and you stay top of the list tonight so that we know you're not scared to get back on the horse. Truth be told it did knock my confidence and anything that was a little out of the ordinary after that I always ended up calling somebody else for a consult. After a while I engineered my self off the on-call list.
In the UK you are more likely to be using millimetres if working from any kind of design. Working in inches and feet would depend on your age and perhaps whether you are working on an older property that was designed in inches.