89 karma · joined October 21, 2021
So maybe: - selection of vod, - books reading, - something else than stupid box which as well cuts down on their imagination (you know, fiest elephant ive heard about from mothers book story... I had to imagine that bastard!)
Netflix has option for kids, but its still little control. There are ghosts whatever. Not really for kids in all age groups.
Its better to use invest in renewables
So youre nice 1 time, then 2nd time, then 3rd... And well then you loose your patience.
Dont take it personally, just shut up and fix that shit xD
Goos tip is to find replacemet, a healthy one. You can get addicted to gentle (not stupid) weight lifting, running (please, on grass, not on cement or next to road full of cars, not on asfalt, its not good for your knees and lungs) reading a book.
Replace it with hobby that you like or put that time into something you wanted to do, but never had time.
Btw. 660 bill on clean up thats nowhere to be done is big impact.
How much lives we could save or improve with that money... damn.
As for night time harvesting energy, we've already solved the issue (and one i link is not the only one) : https://www.saurenergy.com/solar-energy-news/arriving-soon-s...
No one mentioned hydrogen which was being hold by OPEC, but now its getting traction.
650 billions dollars as for now to clean up... What about costs of keeping that stuff safe for next 50 years? What about costs for next 300 years? I dont want grandkids of my grandkids to pay for that. You can buy a lot of powerwalls for that. Thats why tesla got contracts to reduce tensions on electrical grid in california.
In fact, China’s investment in nuclear plants that take so long between planning and operation instead of wind or solar resulted in China’s CO2 emissions increasing 1.3 percent from 2016 to 2017 rather than declining by an estimated average of 3 percent. The resulting difference in air pollution emissions may have caused 69,000 additional air pollution deaths in China in 2016 alone, with additional deaths in years prior and since.
This nuclear LCOE is an underestimate for several reasons. First, Lazard assumes a construction time for nuclear of 5.75 years. However, the Vogtle 3 and 4 reactors, though will take at least 8.5 to 9 years to finish construction. This additional delay alone results in an estimated LCOE for nuclear of about $172 (128 to 215)/MWh, or a cost 2.3 to 7.4 times that of an onshore wind farm (or utility PV farm).
Next, the LCOE does not include the cost of the major nuclear meltdowns in history. For example, the estimated cost to clean up the damage from three Fukushima Dai-ichi nuclear reactor core meltdowns was $460 to $640 billion. This is $1.2 billion, or 10 to 18.5 percent of the capital cost, of every nuclear reactor worldwide.
In addition, the LCOE does not include the cost of storing nuclear waste for hundreds of thousands of years. In the U.S. alone, about $500 million is spent yearly to safeguard nuclear waste from about 100 civilian nuclear energy plants. This amount will only increase as waste continues to accumulate. After the plants retire, the spending must continue for hundreds of thousands of years with no revenue stream from electricity sales to pay for the storage.