Boston's Big Dig tunnels used bolts glued with epoxy to hang the heavy roof panels that hung over the roadway. The epoxy failed catastrophically and the panels fell on a car, killing the driver.
Analysis of the accident blamed the workers who installed the bolts, but I think the big lesson is that construction sites are messy, and don't provide the best environment for the delicate chemical reactions needed to set adhesives properly.