The Red line between Cermak-Chinatown and 95th Street [1] was reconstructed over 5 months [2] in 2013.
[1] None of the reconstructed line was elevated steel structure.
[2] Not "almost two years"
[1] None of the reconstructed line was elevated steel structure.
[2] Not "almost two years"