I suspect that someone flipped the switch away from "More Magic" :)
I suspect that someone flipped the switch away from "More Magic" :)
For reference, 1kV arcs across about 1cm of air, so 25kV needs a full foot of space in air (obviously less with a dielectric, but you get the orders of magnitude).
Source: I design trains for a living, though on the mechanical side
[1] https://twitter.com/stansted_exp/status/527011030728441856
> ... faulty train signalling hardware on PV46 was emitting erroneous signals in addition to the ones it was supposed to emit. These erroneous signals occasionally prevented trains travelling in the vicinity of PV46, including in the opposite direction, from properly communicating with the trackside signalling system. This loss of communications led to the activation of the trains’ emergency brakes.
[1]: https://www.lta.gov.sg/apps/news/page.aspx?c=2&id=89defe38-4...
While the press release says these were "in addition to the ones it was supposed to emit", it's not hard to imagine that a similar error could happen where the wrong signals were sent in-lieu-of the intended signals, and thus leave trains rolling that should have detected an emergency-stop situation.
Not all problems can be troubleshot and there are some things that remain mysteries forever.
Arguably, based on the preliminary explanation, it seems like PV46 might be over-represented (it had 4 interruptions) -- after all, it never travels in the opposite direction to itself.