> The first reactor needs an expensive plant, but dropping in a second or third at the same location, into the same tank, would cost much less.
I don't think that explains it, based on the article. Each individual module produces 50 MW, so a 570 MW plant would already involve 11+ individual modules/reactors. So presumably the modularization effect is already taken into consideration for the cost estimate of the 570 MW plant.