This is something that has been studied in some depth in the UK:
https://theenergyst.com/millions-electric-vehicles-sooner-pr...
https://www.nationalgrid.com/group/case-studies/electric-dre...
But there are 38 million vehicles registered in the UK [1]; and even the optimistic 4GW is greater than the power output of the proposed Hinkley Point C nuclear reactor [2].
If 9 million vehicles need 4-8GW of generation capacity, 38 million would need 17-34GW, i.e. 6.5 to 13 nuclear power stations' worth (or the equivalent in wind or solar)
[1] https://www.racfoundation.org/motoring-faqs/mobility#a1 [2] https://en.wikipedia.org/wiki/Hinkley_Point_C_nuclear_power_...
Clearly if everyone charged their vehicles at peak times there'd be problems meeting demand. But that's not the case: EV charging is a flexible demand, and with "smart" chargers and incentives in place to encourage off-peak/overnight charging, demand peaks can be managed.
Here's the link to the full Future Energy Scenarios document where you can dig in to the figures in great detail:
I don't think I'm confused about that - it seems pretty unambiguous to me.
Or, to put it another way: It doesn't make sense to spend billions on building new power plants just because everybody is plugging in their cars when they get home at 6PM every night and causing a huge demand spike. Smart charging and demand management is a much cheaper way to solve the problem.
So smart charging halves the need for new power stations - but doesn't eliminate it.
You might easily get rid of 10GW of ICE cars and only need to buy 2GW of electrical grid capacity to replace that.
There are lots of more immediately noticeable consequences while you wait decades for any global climate effects, the air on city streets is better, a bunch of land used to store incredibly dangerous liquid fuel where people want to buy it is released for new housing, maintenance costs on cars fall. I don't think it'll take long for the story to be "Why didn't we do this sooner?" rather than "Why did we bother trying this?"
That's already the case. But with 2 million or so cars sucking juice at night, that will no longer be "off peak" and of course the grid needs some downtime which will be harder to do then.
Ireland's electricity is quite dirt. Coal and peat are being phased out, so they already need to replace existing grid generators and now top up with lots of new generation too.
As said, I'm sceptical about it all until I see the grid plans.