You can use all three of these NDT techniques, where are used in nuclear energy and turbofan engine applications, but still fail to detect weak welds or metal fatigue because of improper calculations or conditions in the real world.
There's no substitute for DT to validate the engineering and manufacturing, such as by overpressing a pressure vessel (which are also covered by ASME BPVC).
Oddly enough, I knew a civil engineer (PE) who was an expert witness and wrote code interpretations for BPVC to the tune of $40-60k per for a few hours of work (but having his experience on large industrial projects is an important prerequisite). IIRC, he had a massive house in Saratoga.