1) They are increasing maximum pressure and pressure rate changes beyond the built-in design parameters. If these new parameters are outside what the engineering requirements document spec, these changes are a problem in seeking EUA.
2) In regulatory affairs, authorized, cleared, and approved have very specific (and enforceable) meanings. If someone is loose with how they use these words, it suggests they don’t have someone with regulatory experience involved (a negative sign). The earlier the team can engage with someone with regulatory experience, the better.