The article is about the 13MW Haliade-X tubine, but on part of the Doggerbank (Sofia wind park) an even larger 14MW Siemens Gamesa turbine will be installed. As short as maybe 5 years ago >10MW turbines were thought of as unlikely in the near time, and look where we are now. And we still haven't hit any hard limits, meaning there is still room to grow! And as the turbines grow, so do the foundations. Most turbines are installed on a single steel tube that is driven into the ground, a monopile. A single one can be 100m long, 10m in diameter and weigh 2000 tons!