> The 62-meter (203-ft) prototype blade is made with Elium resin from materials company Arkema, which is a glass-fiber reinforced thermoplastic. Not only is the material 100 percent recyclable, it is said to deliver a similar level of performance to thermoset resins that are favored for their lightweight and durability.
> Through a chemical recycling method, the material can be depolymerized and turned into a new resin for re-use, acting as a proof-of-concept for a circular economy loop for the wind energy sector. Before that happens, in the coming weeks LM Wind Power will start full-scale structural testing to verify the blade's performance