If the same operator also jammed the valve open with a wrench, then ignored the flow meter as it rung up by saying “the leak is transitory”, then yea.
The production of oil and supply chains is not even close to 2019 levels. Electronic manufacturing and tooling needs 1-2 years to catch up to 2019 (current) demand. Scaring investment does not help.