Monster Cables
Even if they could obtain the supply from a plant operator the cabling to get to the site of the tunnel cost a fortune
If we're going to need high temperature superconductors and fusion power, this isn't the first thing I'd use it for.
(I can't deny the fun factor of this, though.)