> Some of the wood used in the foundational carpentry work (tabouret) was found to not meet quality criteria ( not dry enough ).
I would love to see your article, because I think their journalist just doesn't understand how carpentry works :)
In the case of Notre Dame, the works is _extremely_ difficult. We're talking about fitting a massive amount of Oak timber that used to came from 200-300 years old oak trees into a monument.
Finding trees that are in good shape and -at least- old enough so they can be used whole for carpentry is difficult. Turning a tree into a single huge oak beam is difficult. Transporting a beam to Notre-Dame without damaging it is difficult. Assembling several beams together into a "ferme" is difficult. And, of course, carpentry is often done with same-age trees cut at the same time so they can age together in place and dry on site for tighter fit. Getting that repeated xn times is difficult.
If the oak was "too green", that's not an issue, as long as the rest of the oak is also "too green". They will bend and crack, and that's usual for oak carpentry. It's literally the least of their issues.
By the way, the original "forest" of Notre-Dame was built from oak trees that were transported onsite via the Seine. Trunks directly in water. So the wood was completely soaked when cut into place. It's something we don't do anymore, so the oak can be "not dry enough" as you want, it's still going to be dryer than the original.