Because their nuclear power plants are currently going belly up one after another.
Many of them are the same model, with parts from the same factory. That factory made some bad parts. They need to be exchanged. It takes a lot of time, many months.
Many of them are the same model, with parts from the same factory. That factory made some bad parts. They need to be exchanged. It takes a lot of time, many months.
Nukes reliant on Loire valley water are currently curtailing production.
That's old information, the Loire is back up to normal levels after the last two weeks of rain, so nuclear power plants should be operating as before.