COVID saw some interesting procedral changes - massive industrial scale parallelism.
Multiple candidates were developed and trialled in parallel with ramping out mass production, storage and shipping.
Some of this was wasted effort, some of it was useful regardless of which candidates made the final vaccine cut.
The end result was dramatically compressed rollout times.
Right now the world has a billionare or two with negotiated contracts to deliver green (not blue) hydrogen (eg: to Germany) at a scale that significantly increases world hydrogen production within a 5-10 year time frame.
Already the industrial elements are being built for transport, end use, power collection sites, etc.
This activity makes the possibily of dropping in better methods of hydrogen spliting as they are developed feasible in a shorter time frame than otherwise thought possible.