You're looking at 40 years of degradation to the
- every (rubber, for the time) seal needing to be replaced, in every fitting and valve.
- the lower unit seems to have fractured under its own weight (this is likely the ballast tanks), this would need to be remade.
- any pressure areas need to be retested (including the crew area) and replaced (all compressed air storage).
Now, for the easy parts
- the batteries will have to be replaced, but lithium ion is going to give you better performance at smaller size, with less degradation. (You'll have to compensate the weight though)
- the motors will have to be replaced, but can use much more efficient, likely better sealed, better cooled, smaller, safer motors with pwm electric speed controllers.
- modern glass and fastening techniques could replace the viewports, possibly add more as you rebuild the negative pressure vessel.
- air management is easier to instrument.
- you can add a bunch more cameras and sensors on the cheap that are significantly better than the let's