The only thing that can help in that case is batteries.
98% of the power plants I’ve been to run the voltage regulator in voltage control mode with 5% droop. Solar and wind farms can do that too, and I am sure it is required by the system operators to allow them to connect.
If grid operators want more or less reactive power they call us and tell us to change our voltage setpoint on our plants. Can’t they do the same with solar and wind? The grid operator does not need real time control of the setpoint since the control loop responds in real time.